Browse wiki

Jump to navigation Jump to search
On 2/10/2016 at 1000 PST, Columbia enteredOn 2/10/2016 at 1000 PST, Columbia entered a planned evolution to perform channel functional tests on the RadWaste Building noble gas monitor (WEA-RIS-14). Compensatory measures were implemented per station procedures. The station is experiencing equipment issues and the monitor has not been restored within 72 hours (2/13/2016 at 1000 PST) from the start of the outage. The extended outage of this radiological monitoring instrument is, therefore, being reported as a major loss of radiological assessment capability in accordance with regulation 10 CFR 50.72(b)(3)(xiii). </br>Compensatory measures will remain in place until the WEA instrument is restored.</br>The NRC Resident Inspector has been notified.</br>Note: Reactor Power is 75 percent due to a planned plant downpower for unrelated scheduled work with a planned return to 100 percent at 1900 PST on 2/14/16.urn to 100 percent at 1900 PST on 2/14/16.  +
18:00:00, 13 February 2016  +
51,733  +
14:45:00, 13 February 2016  +
18:00:00, 13 February 2016  +
On 2/10/2016 at 1000 PST, Columbia enteredOn 2/10/2016 at 1000 PST, Columbia entered a planned evolution to perform channel functional tests on the RadWaste Building noble gas monitor (WEA-RIS-14). Compensatory measures were implemented per station procedures. The station is experiencing equipment issues and the monitor has not been restored within 72 hours (2/13/2016 at 1000 PST) from the start of the outage. The extended outage of this radiological monitoring instrument is, therefore, being reported as a major loss of radiological assessment capability in accordance with regulation 10 CFR 50.72(b)(3)(xiii). </br>Compensatory measures will remain in place until the WEA instrument is restored.</br>The NRC Resident Inspector has been notified.</br>Note: Reactor Power is 75 percent due to a planned plant downpower for unrelated scheduled work with a planned return to 100 percent at 1900 PST on 2/14/16.urn to 100 percent at 1900 PST on 2/14/16.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
8.333333e-4 d (0.02 hours, 1.190476e-4 weeks, 2.7396e-5 months)  +
00:00:00, 13 February 2016  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:16:51, 24 September 2017  +
14:45:00, 13 February 2016  +
false  +
-0.135 d (-3.25 hours, -0.0193 weeks, -0.00445 months)  +
18:00:00, 13 February 2016  +
Radwaste Building Noble Gas Monitor Out-Of-Service  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
2  +