At 1007 (EDT) on August 12, 2015, while reAt 1007 (EDT) on August 12, 2015, while restoring Reactor Building (RB) HVAC (RBHVAC) after surveillance testing, an equipment malfunction resulted in improper damper alignment resulting in Secondary Containment Technical Specifications (TS) to not be met. </br>The plant TS require Secondary Containment pressure be maintained greater than or equal to -0.125 inches of vacuum water gauge (TS SR 3.6.4.1.1). This specification was not maintained for five seconds and the highest pressure observed was -0.095 inches of vacuum water gauge. This value was observed on only one of two installed recorders, of the Secondary Containment pressure recorders. The highest observed pressure on the other recorder was -0.14 inches of vacuum water gauge. Secondary Containment was restored by the Standby Gas Treatment System (SGTS) already in operation and shutting down the affected train of RBHVAC.</br>The technical specification requirement is to maintain secondary containment at -0.125 inches of vacuum water gauge for secondary containment operability. Declaring secondary containment inoperable is reportable under 10 CFR50.72(b)(3)(v)(c) as an event or condition that could have prevented the fulfillment of a safety function needed to control the release of radioactive material.</br>The licensee notified the NRC Resident Inspector.</br>* * * UPDATE AT 1159 EDT ON 08/13/15 FROM BRETT JEBBIA TO S. SANDIN * * *</br>The licensee is updating this report to delete the minus sign for all references to inches of vacuum water gauge.</br>FOLLOW UP - CORRECTED INFORMATION: At 1007 (EDT) on August 12, 2015, while restoring Reactor Building (RB) HVAC (RBHVAC) after surveillance testing, an equipment malfunction resulted in improper damper alignment resulting in Secondary Containment Technical Specifications (TS) to not be met.</br>The plant TS require Secondary Containment pressure be maintained greater than or equal to .125 inches of vacuum water gauge (TS SR 3.6.4.1.1). This specification was not maintained for five seconds and the highest pressure observed was .095 inches of vacuum water gauge. This value was observed on only one, of two installed recorders, of the Secondary Containment pressure recorders. The highest observed pressure on the other recorder was .14 inches of vacuum water gauge. Secondary Containment was restored by the Standby Gas Treatment System (SGTS) already in operation and shutting down the affected train of RBHV AC.</br>The technical specification requirement is to maintain secondary containment greater than or equal to .125 inches of vacuum water gauge for secondary containment operability. Declaring secondary containment inoperable is reportable under 10CFR50.72(b)(3)(v)c as an event or condition that could have prevented the fulfillment of a safety function needed to control the release of radioactive material.</br>the licensee informed the NRC Resident Inspector. Notified R1DO (Powell).sident Inspector. Notified R1DO (Powell).  
14:07:00, 12 August 2015  +
51,313  +
13:31:00, 12 August 2015  +
14:07:00, 12 August 2015  +
At 1007 (EDT) on August 12, 2015, while reAt 1007 (EDT) on August 12, 2015, while restoring Reactor Building (RB) HVAC (RBHVAC) after surveillance testing, an equipment malfunction resulted in improper damper alignment resulting in Secondary Containment Technical Specifications (TS) to not be met. </br>The plant TS require Secondary Containment pressure be maintained greater than or equal to -0.125 inches of vacuum water gauge (TS SR 3.6.4.1.1). This specification was not maintained for five seconds and the highest pressure observed was -0.095 inches of vacuum water gauge. This value was observed on only one of two installed recorders, of the Secondary Containment pressure recorders. The highest observed pressure on the other recorder was -0.14 inches of vacuum water gauge. Secondary Containment was restored by the Standby Gas Treatment System (SGTS) already in operation and shutting down the affected train of RBHVAC.</br>The technical specification requirement is to maintain secondary containment at -0.125 inches of vacuum water gauge for secondary containment operability. Declaring secondary containment inoperable is reportable under 10 CFR50.72(b)(3)(v)(c) as an event or condition that could have prevented the fulfillment of a safety function needed to control the release of radioactive material.</br>The licensee notified the NRC Resident Inspector.</br>* * * UPDATE AT 1159 EDT ON 08/13/15 FROM BRETT JEBBIA TO S. SANDIN * * *</br>The licensee is updating this report to delete the minus sign for all references to inches of vacuum water gauge.</br>FOLLOW UP - CORRECTED INFORMATION: At 1007 (EDT) on August 12, 2015, while restoring Reactor Building (RB) HVAC (RBHVAC) after surveillance testing, an equipment malfunction resulted in improper damper alignment resulting in Secondary Containment Technical Specifications (TS) to not be met.</br>The plant TS require Secondary Containment pressure be maintained greater than or equal to .125 inches of vacuum water gauge (TS SR 3.6.4.1.1). This specification was not maintained for five seconds and the highest pressure observed was .095 inches of vacuum water gauge. This value was observed on only one, of two installed recorders, of the Secondary Containment pressure recorders. The highest observed pressure on the other recorder was .14 inches of vacuum water gauge. Secondary Containment was restored by the Standby Gas Treatment System (SGTS) already in operation and shutting down the affected train of RBHV AC.</br>The technical specification requirement is to maintain secondary containment greater than or equal to .125 inches of vacuum water gauge for secondary containment operability. Declaring secondary containment inoperable is reportable under 10CFR50.72(b)(3)(v)c as an event or condition that could have prevented the fulfillment of a safety function needed to control the release of radioactive material.</br>the licensee informed the NRC Resident Inspector. Notified R1DO (Powell).sident Inspector. Notified R1DO (Powell).  
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100  +
00:00:00, 13 August 2015  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:17:23, 24 September 2017  +
13:31:00, 12 August 2015  +
false  +
-0.025 d (-0.6 hours, -0.00357 weeks, -8.2188e-4 months)  +
14:07:00, 12 August 2015  +
Secondary Containment Technical Specifications Not Met  +