Browse wiki
Jump to navigation
Jump to search
100 +
On September 22, 2014, at 1000 EDT, the Te … On September 22, 2014, at 1000 EDT, the Technical Support Center (TSC) will be unavailable due to pre-planned maintenance impacting the TSC ventilation envelope. The TSC is expected to be restored to operational status on September 23, 2014.</br>If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures, and the TSC staff will assemble at a preplanned alternate location in accordance with applicable site procedures.</br>This notification is being made in accordance with 10 CFR 50.72(b)(3)(xiii) due to the loss of an emergency response facility (ERF). An update will be provided once the TSC has been restored to operational status. The NRC Resident Inspector has been notified.</br>The maintenance is expected to be completed within 36 hours.</br>* * * UPDATE FROM TIMOTHY MILLER TO HOWIE CROUCH AT 1638 EDT ON 9/23/14 * * *</br>The TSC ventilation envelope has been restored. The TSC is returned to operational status on September 23, 2014 at 1600 EDT. The NRC Resident Inspector has been notified.</br>Notified R2DO (Widman).has been notified.
Notified R2DO (Widman). +
14:00:00, 22 September 2014 +
50,478 +
09:34:00, 22 September 2014 +
14:00:00, 22 September 2014 +
On September 22, 2014, at 1000 EDT, the Te … On September 22, 2014, at 1000 EDT, the Technical Support Center (TSC) will be unavailable due to pre-planned maintenance impacting the TSC ventilation envelope. The TSC is expected to be restored to operational status on September 23, 2014.</br>If an emergency is declared requiring TSC activation during this period, the TSC will be staffed and activated using existing emergency planning procedures, and the TSC staff will assemble at a preplanned alternate location in accordance with applicable site procedures.</br>This notification is being made in accordance with 10 CFR 50.72(b)(3)(xiii) due to the loss of an emergency response facility (ERF). An update will be provided once the TSC has been restored to operational status. The NRC Resident Inspector has been notified.</br>The maintenance is expected to be completed within 36 hours.</br>* * * UPDATE FROM TIMOTHY MILLER TO HOWIE CROUCH AT 1638 EDT ON 9/23/14 * * *</br>The TSC ventilation envelope has been restored. The TSC is returned to operational status on September 23, 2014 at 1600 EDT. The NRC Resident Inspector has been notified.</br>Notified R2DO (Widman).has been notified.
Notified R2DO (Widman). +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100 +
00:00:00, 23 September 2014 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:19:11, 24 September 2017 +
09:34:00, 22 September 2014 +
true +
false +
-0.185 d (-4.43 hours, -0.0264 weeks, -0.00607 months) +
14:00:00, 22 September 2014 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.