Browse wiki
Jump to navigation
Jump to search
100 +
At 0607 hours PDT on September 6, 2013, th … At 0607 hours PDT on September 6, 2013, the Radwaste Building process radiation monitoring sample rack was declared non-functional due to a loss of power to the sample rack. The cause of the loss of power is under investigation.</br>At 0945 hours PDT, auxiliary sampling equipment was installed to collect samples from the associated effluent release pathway.</br>To compensate for the loss of assessment capability while the Radwaste Building process radiation monitoring sample rack is non-functional, field team survey results will be used if required.</br>This event is being reported as a loss of emergency assessment capability in accordance with 10CFR50.72(b)(3)(xiii).</br>The licensee has notified the NRC Resident Inspector.</br>* * * UPDATE FROM QUOC VO TO VINCE KLCO ON 9/6/13 AT 2251 EDT * * * </br>Repairs have been completed and the Radwaste Building process radiation monitoring sample rack has been returned to service and declared functional at 1631 hours PDT.</br>The licensee has notified the NRC Resident Inspector.</br>Notified the R4DO (Gaddy).dent Inspector.
Notified the R4DO (Gaddy). +
13:07:00, 6 September 2013 +
49,328 +
14:47:00, 6 September 2013 +
13:07:00, 6 September 2013 +
At 0607 hours PDT on September 6, 2013, th … At 0607 hours PDT on September 6, 2013, the Radwaste Building process radiation monitoring sample rack was declared non-functional due to a loss of power to the sample rack. The cause of the loss of power is under investigation.</br>At 0945 hours PDT, auxiliary sampling equipment was installed to collect samples from the associated effluent release pathway.</br>To compensate for the loss of assessment capability while the Radwaste Building process radiation monitoring sample rack is non-functional, field team survey results will be used if required.</br>This event is being reported as a loss of emergency assessment capability in accordance with 10CFR50.72(b)(3)(xiii).</br>The licensee has notified the NRC Resident Inspector.</br>* * * UPDATE FROM QUOC VO TO VINCE KLCO ON 9/6/13 AT 2251 EDT * * * </br>Repairs have been completed and the Radwaste Building process radiation monitoring sample rack has been returned to service and declared functional at 1631 hours PDT.</br>The licensee has notified the NRC Resident Inspector.</br>Notified the R4DO (Gaddy).dent Inspector.
Notified the R4DO (Gaddy). +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100 +
00:00:00, 6 September 2013 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:21:47, 24 September 2017 +
14:47:00, 6 September 2013 +
true +
false +
0.0696 d (1.67 hours, 0.00994 weeks, 0.00229 months) +
13:07:00, 6 September 2013 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.