Browse wiki

Jump to navigation Jump to search
100  +
A and B Main Steam Line Radiation MonitorsA and B Main Steam Line Radiation Monitors 3MSS-RE75 and 76 have failed and were declared inoperable at 0513 hours July 10, 2013. Repairs have been completed and A and B Main Steam Line Radiation Monitors 3MSS-RE75 and 3MSS-RE76 were returned to service at 0900 hours July 10, 2013. The unit is in Mode 1.</br>This event is reportable pursuant to 10 CFR 50.72(b)(3)(xiii) as is any event that results in a major loss of emergency assessment capability, off-site response capability, or off-site communications capability.</br>The licensee informed the State of Connecticut, Waterford dispatch, and the NRC Resident Inspector. dispatch, and the NRC Resident Inspector.  +
09:13:00, 10 July 2013  +
49,183  +
12:46:00, 10 July 2013  +
09:13:00, 10 July 2013  +
A and B Main Steam Line Radiation MonitorsA and B Main Steam Line Radiation Monitors 3MSS-RE75 and 76 have failed and were declared inoperable at 0513 hours July 10, 2013. Repairs have been completed and A and B Main Steam Line Radiation Monitors 3MSS-RE75 and 3MSS-RE76 were returned to service at 0900 hours July 10, 2013. The unit is in Mode 1.</br>This event is reportable pursuant to 10 CFR 50.72(b)(3)(xiii) as is any event that results in a major loss of emergency assessment capability, off-site response capability, or off-site communications capability.</br>The licensee informed the State of Connecticut, Waterford dispatch, and the NRC Resident Inspector. dispatch, and the NRC Resident Inspector.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
0.00594 d (0.143 hours, 8.482143e-4 weeks, 1.951965e-4 months)  +  and 0.0104 d (0.25 hours, 0.00149 weeks, 3.4245e-4 months)  +
100  +
00:00:00, 10 July 2013  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:00:30, 2 March 2018  +
12:46:00, 10 July 2013  +
false  +
0.148 d (3.55 hours, 0.0211 weeks, 0.00486 months)  +
09:13:00, 10 July 2013  +
Loss of Assessment Capability Due to Failure of a & B Main Steam Line Radiation Monitors  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
3  +