Browse wiki

Jump to navigation Jump to search
100  +
After securing the Unit 1 HPCI turbine froAfter securing the Unit 1 HPCI turbine from service following a planned pump, valve, and flow surveillance test an oil leak of approximately 1 pint per minute developed. The oil leak was stopped by securing the auxiliary oil pump for the HPCI system. </br>There was no loss of oil pressure while the HPCI turbine was operating. This issue has caused the Unit 1 HPCI system to be declared inoperable and unavailable. Per LGS (Limerick Generating Station) Unit 1 Technical Specifications section 3.5.1, the HPCI system must be restored to operable status within 14 days. </br>The cause of the oil leak is being investigated." </br>The licensee notified the NRC Resident Inspector.</br>* * * UPDATE FROM DANIEL WILLIAMSON TO DONALD NORWOOD AT 1510 EDT ON MARCH 21, 2013 * * *</br>UNIT 1 HPCI has been restored to operable status following repairs and post-maintenance testing at 1300 EDT on March 21, 2013.</br>The licensee changed the reporting requirement from 10CFR50.72(b)(3)(ii)(A) to 10CFR50.72(b)(3)(v((D).</br>The licensee will notify the NRC Resident Inspector. Notified R1DO (Trapp).esident Inspector. Notified R1DO (Trapp).  +
18:47:00, 20 March 2013  +
48,837  +
20:52:00, 20 March 2013  +
18:47:00, 20 March 2013  +
After securing the Unit 1 HPCI turbine froAfter securing the Unit 1 HPCI turbine from service following a planned pump, valve, and flow surveillance test an oil leak of approximately 1 pint per minute developed. The oil leak was stopped by securing the auxiliary oil pump for the HPCI system. </br>There was no loss of oil pressure while the HPCI turbine was operating. This issue has caused the Unit 1 HPCI system to be declared inoperable and unavailable. Per LGS (Limerick Generating Station) Unit 1 Technical Specifications section 3.5.1, the HPCI system must be restored to operable status within 14 days. </br>The cause of the oil leak is being investigated." </br>The licensee notified the NRC Resident Inspector.</br>* * * UPDATE FROM DANIEL WILLIAMSON TO DONALD NORWOOD AT 1510 EDT ON MARCH 21, 2013 * * *</br>UNIT 1 HPCI has been restored to operable status following repairs and post-maintenance testing at 1300 EDT on March 21, 2013.</br>The licensee changed the reporting requirement from 10CFR50.72(b)(3)(ii)(A) to 10CFR50.72(b)(3)(v((D).</br>The licensee will notify the NRC Resident Inspector. Notified R1DO (Trapp).esident Inspector. Notified R1DO (Trapp).  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100  +
00:00:00, 21 March 2013  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:22:56, 24 September 2017  +
20:52:00, 20 March 2013  +
false  +
0.0867 d (2.08 hours, 0.0124 weeks, 0.00285 months)  +
18:47:00, 20 March 2013  +
High Pressure Coolant Injection (Hpci) Turbine Oil Leak  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +