Browse wiki
Jump to navigation
Jump to search
The following information was received by … The following information was received by email:</br>On Monday, January 14, 2013, the (State of Tennessee) Division of Radiological Health received a report from Methodist University Hospital regarding a stuck HDR source. A patient was to be treated with the high dose rate remote afterloader (Nucletron model 105.999) on January 14th. The radiation source became stuck in the applicator/transfer tube at the beginning of treatment before reaching the patient. The physicists and physician followed the policy and procedure for removal of the source and tubing. The source was placed in a shielded container. A Nucletron engineer was notified by phone and arrived at 1600 CST, but was unable to dislodge the source from the transfer tube. The source and transfer tube will be sent back to Nucletron and replacements have been ordered. A written report is being prepared and will be sent to the Division of Radiological Health. Inspectors from the Memphis field office will follow-up on this incident and will continue to keep NRC informed of the status of our investigation.</br>Tennessee Event: TN-13-013 investigation.
Tennessee Event: TN-13-013 +
17:15:00, 14 January 2013 +
48,674 +
12:45:00, 15 January 2013 +
17:15:00, 14 January 2013 +
The following information was received by … The following information was received by email:</br>On Monday, January 14, 2013, the (State of Tennessee) Division of Radiological Health received a report from Methodist University Hospital regarding a stuck HDR source. A patient was to be treated with the high dose rate remote afterloader (Nucletron model 105.999) on January 14th. The radiation source became stuck in the applicator/transfer tube at the beginning of treatment before reaching the patient. The physicists and physician followed the policy and procedure for removal of the source and tubing. The source was placed in a shielded container. A Nucletron engineer was notified by phone and arrived at 1600 CST, but was unable to dislodge the source from the transfer tube. The source and transfer tube will be sent back to Nucletron and replacements have been ordered. A written report is being prepared and will be sent to the Division of Radiological Health. Inspectors from the Memphis field office will follow-up on this incident and will continue to keep NRC informed of the status of our investigation.</br>Tennessee Event: TN-13-013 investigation.
Tennessee Event: TN-13-013 +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 15 January 2013 +
R-79027-H-15 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:01:58, 2 March 2018 +
12:45:00, 15 January 2013 +
0.813 d (19.5 hours, 0.116 weeks, 0.0267 months) +
17:15:00, 14 January 2013 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.