Browse wiki
Jump to navigation
Jump to search
98 +
At approximately 1428 EDT on October 11, 2 … At approximately 1428 EDT on October 11, 2012, preplanned maintenance will be performed that will affect the Technical Support Center (TSC) ventilation system. This maintenance will be performed as part of an electric heater control panel inspection (DH-1). This maintenance is expected to be performed and completed within 4 hours. If an emergency condition should occur, the power will be restored, but potentially not within the time required for activation of the TSC. In addition, the Harris Nuclear Plant (HNP) emergency plan has procedural guidance for use of an alternate location in the event the TSC is not habitable.</br>This event is reportable per 10CFR50.72(b)(3)(xiii) as described in NUREG-1022, Rev. 2 since this work activity affects an emergency response facility for the duration of the maintenance.</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector. +
18:28:00, 11 October 2012 +
15:00:00, 11 October 2012 +
18:28:00, 11 October 2012 +
At approximately 1428 EDT on October 11, 2 … At approximately 1428 EDT on October 11, 2012, preplanned maintenance will be performed that will affect the Technical Support Center (TSC) ventilation system. This maintenance will be performed as part of an electric heater control panel inspection (DH-1). This maintenance is expected to be performed and completed within 4 hours. If an emergency condition should occur, the power will be restored, but potentially not within the time required for activation of the TSC. In addition, the Harris Nuclear Plant (HNP) emergency plan has procedural guidance for use of an alternate location in the event the TSC is not habitable.</br>This event is reportable per 10CFR50.72(b)(3)(xiii) as described in NUREG-1022, Rev. 2 since this work activity affects an emergency response facility for the duration of the maintenance.</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
98 +
00:00:00, 11 October 2012 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:02:48, 2 March 2018 +
15:00:00, 11 October 2012 +
true +
false +
-0.145 d (-3.47 hours, -0.0207 weeks, -0.00475 months) +
18:28:00, 11 October 2012 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.