Browse wiki
Jump to navigation
Jump to search
100 +
At 1332 CDT on 8/24/12 a failure of power … At 1332 CDT on 8/24/12 a failure of power supply RMA-ES-53A was indicated in the Control Room. The power supply was declared Non-Functional. This failure results in the loss of ability to remotely measure and quantify radiological conditions (radiation levels) for multiple areas in the Reactor Building. The power supply provides power to RMA-RA-1 through RMA-RA-10. RMA-RA-11 through RMA-RA-30 remain fully functional and indicating normally.</br>The loss of ability to monitor and quantify radiological conditions in multiple areas of the Reactor Building represents a major loss of emergency assessment capability per 10 CFR 50.72(b)(3)(xiii). As specified by station procedures, compensatory measures have been implemented to survey affected areas by installation of portable monitoring devices and trending radiological conditions. RMA-RA-1 through RMA-RA-10 are used for EAL determinations.</br>The Work Week Director has been notified to initiate repairs.</br>The licensee has notified the NRC Resident Inspector.e has notified the NRC Resident Inspector. +
18:32:00, 24 August 2012 +
48,230 +
17:33:00, 24 August 2012 +
18:32:00, 24 August 2012 +
At 1332 CDT on 8/24/12 a failure of power … At 1332 CDT on 8/24/12 a failure of power supply RMA-ES-53A was indicated in the Control Room. The power supply was declared Non-Functional. This failure results in the loss of ability to remotely measure and quantify radiological conditions (radiation levels) for multiple areas in the Reactor Building. The power supply provides power to RMA-RA-1 through RMA-RA-10. RMA-RA-11 through RMA-RA-30 remain fully functional and indicating normally.</br>The loss of ability to monitor and quantify radiological conditions in multiple areas of the Reactor Building represents a major loss of emergency assessment capability per 10 CFR 50.72(b)(3)(xiii). As specified by station procedures, compensatory measures have been implemented to survey affected areas by installation of portable monitoring devices and trending radiological conditions. RMA-RA-1 through RMA-RA-10 are used for EAL determinations.</br>The Work Week Director has been notified to initiate repairs.</br>The licensee has notified the NRC Resident Inspector.e has notified the NRC Resident Inspector. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100 +
00:00:00, 24 August 2012 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:03:18, 2 March 2018 +
17:33:00, 24 August 2012 +
true +
false +
-0.0408 d (-0.98 hours, -0.00583 weeks, -0.00134 months) +
18:32:00, 24 August 2012 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.