Browse wiki

Jump to navigation Jump to search
At approximately 0800 (EDT) on April 16, 2At approximately 0800 (EDT) on April 16, 2012, the Harris Nuclear Plant (HNP) Technical Support Center (TSC) normal power feed will be removed from service for scheduled maintenance.</br>The maintenance will consist of first switching the TSC to the TSC backup power supply. The normal supply will be disconnected and replaced with another offsite power source which is independent of the Harris switchyard. This power arrangement will remain in place while maintenance is performed on the TSC normal power supply and is expected to last approximately two months. A backup diesel generator is stationed near the TSC which can be connected if necessary during an emergency.</br>An update will be provided when the TSC normal power supply has been returned to its normal alignment</br>This event is reportable per 10CFR50.72(b)(3)(xiii) as described in NUREG-1022, Rev. 2, since this work activity affects an emergency response facility for the duration of the maintenance.</br>The (NRC) Senior Resident Inspector has been informed.nior Resident Inspector has been informed.  +
12:00:00, 16 April 2012  +
47,838  +
07:38:00, 16 April 2012  +
12:00:00, 16 April 2012  +
At approximately 0800 (EDT) on April 16, 2At approximately 0800 (EDT) on April 16, 2012, the Harris Nuclear Plant (HNP) Technical Support Center (TSC) normal power feed will be removed from service for scheduled maintenance.</br>The maintenance will consist of first switching the TSC to the TSC backup power supply. The normal supply will be disconnected and replaced with another offsite power source which is independent of the Harris switchyard. This power arrangement will remain in place while maintenance is performed on the TSC normal power supply and is expected to last approximately two months. A backup diesel generator is stationed near the TSC which can be connected if necessary during an emergency.</br>An update will be provided when the TSC normal power supply has been returned to its normal alignment</br>This event is reportable per 10CFR50.72(b)(3)(xiii) as described in NUREG-1022, Rev. 2, since this work activity affects an emergency response facility for the duration of the maintenance.</br>The (NRC) Senior Resident Inspector has been informed.nior Resident Inspector has been informed.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 16 April 2012  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:04:22, 2 March 2018  +
07:38:00, 16 April 2012  +
false  +
-0.182 d (-4.37 hours, -0.026 weeks, -0.00599 months)  +
12:00:00, 16 April 2012  +
Planned Maintenance on the Technical Support Center Normal Power Supply  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +