Browse wiki

Jump to navigation Jump to search
100  +
At approximately 0800 EDT on March 14, 201At approximately 0800 EDT on March 14, 2012, preplanned maintenance will be performed on the Technical Support Center (TSC) ventilation system. This maintenance will be performed for door seal replacement, ventilation shaft seal and belt replacement. This maintenance is planned to be performed and completed within 10 hours. If an emergency condition should occur that would require activation of the TSC, the Harris Nuclear Plant (HNP) emergency plan has procedural guidance for use of an alternate location.</br>This event is reportable per 10 CFR 50.72(b)(3)(xiii) as described in NUREG-1022, Rev. 2 since this work activity affects an emergency response facility for the duration of the maintenance.</br>The licensee notified the NRC Resident Inspector.</br>* * * UPDATE FROM RICHARD VANDENBERG TO JOHN KNOKE AT 1735 EDT ON 03/14/2012 * * *</br>The preplanned maintenance on the Technical Support Center (TSC) ventilation system was completed at 1730 EDT. The TSC is now fully functional. </br>The licensee has notified the NRC Resident Inspector. Notified the R2DO (Guthrie).</br>* * * UPDATE FROM RICHARD VANDENBERG TO CHARLES TEAL AT 0840 EDT ON 03/15/2012 * * * </br>At approximately 0800 on March 14, 2012 preplanned maintenance will be performed on the TSC ventilation system. This maintenance will be performed for door seal inspections and ventilation fan belt inspections. This maintenance is planned to be performed and completed within 10 hours. If an emergency condition should occur that would require evacuation of the TSC, the Harris Nuclear Plant (HNP) emergency plant has procedural guidance for use of an alternate location.</br>This event is reportable per 10 CFR 50.72(b)(3)(xiii) as described in NUREG-1022, Rev. 2 since this work activity reflects an emergency response facility for the duration of the maintenance.</br>The licensee has notified the NRC Resident Inspector. Notified the R2DO (Guthrie).</br>* * * UPDATE FROM RICHARD VANDENBERG TO DONALD NORWOOD AT 1650 EDT ON 03/15/2012 * * *</br>At approximately 1630 on March 15, 2012, all scheduled maintenance has been completed and the TSC has been restored to a fully functional status.</br>The licensee notified the NRC Resident Inspector. Notified R2DO (Guthrie).ident Inspector. Notified R2DO (Guthrie).  
12:00:00, 14 March 2012  +
47,740  +
08:00:00, 14 March 2012  +
12:00:00, 14 March 2012  +
At approximately 0800 EDT on March 14, 201At approximately 0800 EDT on March 14, 2012, preplanned maintenance will be performed on the Technical Support Center (TSC) ventilation system. This maintenance will be performed for door seal replacement, ventilation shaft seal and belt replacement. This maintenance is planned to be performed and completed within 10 hours. If an emergency condition should occur that would require activation of the TSC, the Harris Nuclear Plant (HNP) emergency plan has procedural guidance for use of an alternate location.</br>This event is reportable per 10 CFR 50.72(b)(3)(xiii) as described in NUREG-1022, Rev. 2 since this work activity affects an emergency response facility for the duration of the maintenance.</br>The licensee notified the NRC Resident Inspector.</br>* * * UPDATE FROM RICHARD VANDENBERG TO JOHN KNOKE AT 1735 EDT ON 03/14/2012 * * *</br>The preplanned maintenance on the Technical Support Center (TSC) ventilation system was completed at 1730 EDT. The TSC is now fully functional. </br>The licensee has notified the NRC Resident Inspector. Notified the R2DO (Guthrie).</br>* * * UPDATE FROM RICHARD VANDENBERG TO CHARLES TEAL AT 0840 EDT ON 03/15/2012 * * * </br>At approximately 0800 on March 14, 2012 preplanned maintenance will be performed on the TSC ventilation system. This maintenance will be performed for door seal inspections and ventilation fan belt inspections. This maintenance is planned to be performed and completed within 10 hours. If an emergency condition should occur that would require evacuation of the TSC, the Harris Nuclear Plant (HNP) emergency plant has procedural guidance for use of an alternate location.</br>This event is reportable per 10 CFR 50.72(b)(3)(xiii) as described in NUREG-1022, Rev. 2 since this work activity reflects an emergency response facility for the duration of the maintenance.</br>The licensee has notified the NRC Resident Inspector. Notified the R2DO (Guthrie).</br>* * * UPDATE FROM RICHARD VANDENBERG TO DONALD NORWOOD AT 1650 EDT ON 03/15/2012 * * *</br>At approximately 1630 on March 15, 2012, all scheduled maintenance has been completed and the TSC has been restored to a fully functional status.</br>The licensee notified the NRC Resident Inspector. Notified R2DO (Guthrie).ident Inspector. Notified R2DO (Guthrie).  
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
1.157407e-4 d (0.00278 hours, 1.653439e-5 weeks, 3.805e-6 months)  +
100  +
00:00:00, 15 March 2012  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:25:44, 24 September 2017  +
08:00:00, 14 March 2012  +
false  +
-0.167 d (-4 hours, -0.0238 weeks, -0.00548 months)  +
12:00:00, 14 March 2012  +
Technical Support Center Planned Maintenance  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +