Browse wiki

Jump to navigation Jump to search
At approximately 1115 EDT on 10/25/11 an iAt approximately 1115 EDT on 10/25/11 an intern entered the dry gamma room at the Rhode Island Nuclear Science Center Facility during an ion probe calibration procedure. The intern received an estimated unplanned dose of between 2-3 rem based on a stay time of 5 minutes in a 500 mr/min field. His dosimetry, an OSL (Optically Stimulated Luminescence) badge, has been sent to Landauer for expedited processing. The dry gamma room is properly posted as a high radiation area with administrative controls in effect to limit access. The assistant Director of the facility is performing an investigation including event reconstruction to determine the cause.</br>* * * UPDATE FROM JEFF DAVIS (LICENSEE) TO HUFFMAN ON 10/26/11 AT 10:03 EDT * * *</br>The licensee clarified that the call to the Operations Center made on 10/25/11 was a 24 hour notification required by the facility's Technical Specification 1.25.8 based on the potential for over-exposure. </br>NRR Backup Project Manager (Hardesty) notified.ackup Project Manager (Hardesty) notified.  +
15:15:00, 25 October 2011  +
47,375  +
13:07:00, 25 October 2011  +
15:15:00, 25 October 2011  +
At approximately 1115 EDT on 10/25/11 an iAt approximately 1115 EDT on 10/25/11 an intern entered the dry gamma room at the Rhode Island Nuclear Science Center Facility during an ion probe calibration procedure. The intern received an estimated unplanned dose of between 2-3 rem based on a stay time of 5 minutes in a 500 mr/min field. His dosimetry, an OSL (Optically Stimulated Luminescence) badge, has been sent to Landauer for expedited processing. The dry gamma room is properly posted as a high radiation area with administrative controls in effect to limit access. The assistant Director of the facility is performing an investigation including event reconstruction to determine the cause.</br>* * * UPDATE FROM JEFF DAVIS (LICENSEE) TO HUFFMAN ON 10/26/11 AT 10:03 EDT * * *</br>The licensee clarified that the call to the Operations Center made on 10/25/11 was a 24 hour notification required by the facility's Technical Specification 1.25.8 based on the potential for over-exposure. </br>NRR Backup Project Manager (Hardesty) notified.ackup Project Manager (Hardesty) notified.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
2.777778e-4 d (0.00667 hours, 3.968254e-5 weeks, 9.132e-6 months)  +
00:00:00, 26 October 2011  +
R-95  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:05:40, 2 March 2018  +
13:07:00, 25 October 2011  +
-0.0888 d (-2.13 hours, -0.0127 weeks, -0.00292 months)  +
15:15:00, 25 October 2011  +
24 Hour Technical Specification Required Report Based on a Potential Over-Exposure Event  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.