Browse wiki

Jump to navigation Jump to search
At 0327 (CDT) on August 11, 2011, NextEra At 0327 (CDT) on August 11, 2011, NextEra Energy Duane Arnold commenced a reactor shutdown as required by TS 3.7.2.B for both River Water Supply subsystems inoperable. At 0008 (CDT), both River Water Supply subsystems were declared inoperable as a result of high differential pressure across the intake travelling screens. TS 3.7.2.B requires that one River Water Supply subsystem be restored or commence reactor shutdown. While the River Water Supply system is currently supplying rated flow, high differential pressure across the travelling screens indicates the potential for eventual degraded flow. This event is being reported pursuant to the requirements of 10 CFR 50.72(b)(2)(i), as a TS required shutdown.</br>Additionally, the current condition of both trains of River Water Supply inoperable also potentially affects the plant capability to remove residual heat. Therefore, this event is also being reported under 10 CFR 50.72(b )(3)(v)(B), as an event that could prevent fulfillment of a safety function.</br>The NRC Resident Inspector has been notified. NRC Resident Inspector has been notified.  +
08:27:00, 11 August 2011  +
07:02:00, 11 August 2011  +
08:27:00, 11 August 2011  +
At 0327 (CDT) on August 11, 2011, NextEra At 0327 (CDT) on August 11, 2011, NextEra Energy Duane Arnold commenced a reactor shutdown as required by TS 3.7.2.B for both River Water Supply subsystems inoperable. At 0008 (CDT), both River Water Supply subsystems were declared inoperable as a result of high differential pressure across the intake travelling screens. TS 3.7.2.B requires that one River Water Supply subsystem be restored or commence reactor shutdown. While the River Water Supply system is currently supplying rated flow, high differential pressure across the travelling screens indicates the potential for eventual degraded flow. This event is being reported pursuant to the requirements of 10 CFR 50.72(b)(2)(i), as a TS required shutdown.</br>Additionally, the current condition of both trains of River Water Supply inoperable also potentially affects the plant capability to remove residual heat. Therefore, this event is also being reported under 10 CFR 50.72(b )(3)(v)(B), as an event that could prevent fulfillment of a safety function.</br>The NRC Resident Inspector has been notified. NRC Resident Inspector has been notified.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 11 August 2011  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:06:21, 2 March 2018  +
07:02:00, 11 August 2011  +
false  +
-0.0592 d (-1.42 hours, -0.00845 weeks, -0.00195 months)  +
08:27:00, 11 August 2011  +
Initiation of Technical Specification Required Shutdown  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +