Browse wiki

Jump to navigation Jump to search
100  +
On July 20, 2011 at 1318 PDT, during perfoOn July 20, 2011 at 1318 PDT, during performance of STP M-9A, 'Diesel Engine Generator Routine Surveillance Test,' personnel reported a fire on the Unit 1 Emergency Diesel Generator (EDG) 1-1. No abnormal indications were observed in the control room and no annunciator for 'Fire Detected' was received. Operators shutdown the EDG and the onsite fire department responded immediately.</br>On July 20, 2011 at 1322 PDT, personnel reported that the fire, which was centered around the exhaust insulation material, had been extinguished.</br>EDG 1-1 is in a scheduled Maintenance Outage Window (MOW) and is not being relied on for emergency onsite power. The two sources of offsite power (the 230 kV startup system and the 500 kV system) along with the remaining two EDGs, are available and operable.</br>Unit 2 was not affected by the event.</br>The NRC Resident Inspector has been notified.</br>A press release will be issued by the licensee.ss release will be issued by the licensee.  +
20:18:00, 20 July 2011  +
47,079  +
20:10:00, 20 July 2011  +
20:18:00, 20 July 2011  +
On July 20, 2011 at 1318 PDT, during perfoOn July 20, 2011 at 1318 PDT, during performance of STP M-9A, 'Diesel Engine Generator Routine Surveillance Test,' personnel reported a fire on the Unit 1 Emergency Diesel Generator (EDG) 1-1. No abnormal indications were observed in the control room and no annunciator for 'Fire Detected' was received. Operators shutdown the EDG and the onsite fire department responded immediately.</br>On July 20, 2011 at 1322 PDT, personnel reported that the fire, which was centered around the exhaust insulation material, had been extinguished.</br>EDG 1-1 is in a scheduled Maintenance Outage Window (MOW) and is not being relied on for emergency onsite power. The two sources of offsite power (the 230 kV startup system and the 500 kV system) along with the remaining two EDGs, are available and operable.</br>Unit 2 was not affected by the event.</br>The NRC Resident Inspector has been notified.</br>A press release will be issued by the licensee.ss release will be issued by the licensee.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100  +
00:00:00, 20 July 2011  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:06:34, 2 March 2018  +
20:10:00, 20 July 2011  +
false  +
-0.00542 d (-0.13 hours, -7.738095e-4 weeks, -1.78074e-4 months)  +
20:18:00, 20 July 2011  +
Offsite Notification - Press Release After Fire on Site  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +