Browse wiki
Jump to navigation
Jump to search
At 0500 on Saturday, July 16th and 0700 on … At 0500 on Saturday, July 16th and 0700 on Saturday, July 23rd, a sequence of activities are planned that will render the Technical Support Center (TSC) non-functional by removing all normal and emergency power. These activities are being performed in support of planned TSC facility upgrades. In preparation for this power outage(s), the TSC emergency responders were notified that use of the alternate TSC will be required in accordance with station procedures. Each TSC emergency response function has performed a walkdown and verification that required functions can be established in the alternate location. The duration for each of these TSC power outages is expected to be less than 24 hours. The NRC Operations Center will be provided an update to this notification when power has been removed and restored during this time period.</br>The licensee has notified the NRC Resident Inspector.</br>* * * UPDATE FROM RICK VIRGIN TO CHARLES TEAL @ 0730 ON 7/16/11 * * *</br>On 7/16/2011 at 0707 power was removed from the TSC. If necessary, the alternate TSC is ready for use.</br>* * * UPDATE FROM WARREN DEAGLE TO BILL HUFFMAN AT 1800 ON 7/16/11 * * *</br>On 7/16/11 at 1729 EDT, power was restored to the TSC. The TSC has been restored to a normal operational status and can be utilized for emergency response.</br>The licensee has notified the NRC Resident Inspector. R2DO (Freeman) notified.</br>* * * UPDATE FROM CHRISTINE McKIM TO CHARLES TEAL AT 0647 EDT ON 7/23/11 * * *</br>On 7/23/11 at 0645 power was removed from the TSC. If necessary, the alternate TSC is ready for use.</br>The licensee has notified the NRC Resident Inspector. R2DO (Sykes) notified.</br>* * * UPDATE AT 1650 ON 7/23/2011 FROM DAVID McAGY TO MARK ABRAMOVITZ * * *</br>(At 1613), "power has been restored to the TSC. The normal TSC can be utilized for ERO response. There are no further planned TSC outages at this time.</br>Notified the R2DO (Sykes).s at this time.
Notified the R2DO (Sykes). +
09:00:00, 16 July 2011 +
47,056 +
13:15:00, 15 July 2011 +
09:00:00, 16 July 2011 +
At 0500 on Saturday, July 16th and 0700 on … At 0500 on Saturday, July 16th and 0700 on Saturday, July 23rd, a sequence of activities are planned that will render the Technical Support Center (TSC) non-functional by removing all normal and emergency power. These activities are being performed in support of planned TSC facility upgrades. In preparation for this power outage(s), the TSC emergency responders were notified that use of the alternate TSC will be required in accordance with station procedures. Each TSC emergency response function has performed a walkdown and verification that required functions can be established in the alternate location. The duration for each of these TSC power outages is expected to be less than 24 hours. The NRC Operations Center will be provided an update to this notification when power has been removed and restored during this time period.</br>The licensee has notified the NRC Resident Inspector.</br>* * * UPDATE FROM RICK VIRGIN TO CHARLES TEAL @ 0730 ON 7/16/11 * * *</br>On 7/16/2011 at 0707 power was removed from the TSC. If necessary, the alternate TSC is ready for use.</br>* * * UPDATE FROM WARREN DEAGLE TO BILL HUFFMAN AT 1800 ON 7/16/11 * * *</br>On 7/16/11 at 1729 EDT, power was restored to the TSC. The TSC has been restored to a normal operational status and can be utilized for emergency response.</br>The licensee has notified the NRC Resident Inspector. R2DO (Freeman) notified.</br>* * * UPDATE FROM CHRISTINE McKIM TO CHARLES TEAL AT 0647 EDT ON 7/23/11 * * *</br>On 7/23/11 at 0645 power was removed from the TSC. If necessary, the alternate TSC is ready for use.</br>The licensee has notified the NRC Resident Inspector. R2DO (Sykes) notified.</br>* * * UPDATE AT 1650 ON 7/23/2011 FROM DAVID McAGY TO MARK ABRAMOVITZ * * *</br>(At 1613), "power has been restored to the TSC. The normal TSC can be utilized for ERO response. There are no further planned TSC outages at this time.</br>Notified the R2DO (Sykes).s at this time.
Notified the R2DO (Sykes). +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 23 July 2011 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:06:31, 2 March 2018 +
13:15:00, 15 July 2011 +
false +
false +
-0.823 d (-19.75 hours, -0.118 weeks, -0.0271 months) +
09:00:00, 16 July 2011 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.