Browse wiki

Jump to navigation Jump to search
Dose assessment cannot be performed onsiteDose assessment cannot be performed onsite.</br>Pursuant to 10CFR50.72 (b)(3)(xiii), Monticello Nuclear Generating Plant is reporting a planned loss of emergency assessment capability scheduled for 0915 hours on May 10, 2011 for system maintenance. Dose assessment in the control room, TSC, and EOF are non-functional. Main meteorological tower data is unavailable. Projected outage duration is approximately 7 hours. Control room and local instrumentation/annunciation remain available for accident assessment. Telephone lines remain available between site emergency response facilities and offsite agencies for communication of plant status information. Dose assessment capabilities will exist at the backup EOF. Backup meteorological data will be available in the control room, TSC, and EOF. </br>The licensee will not be in any Technical Specification action statements as a result of this evolution. </br>The NRC Resident Inspector has been notified.</br> * * * UPDATE FROM JEFF OLSON TO PETE SNYDER ON 5/10/11 AT 1650 EDT * * * </br>The licensee has restored their dose assessment capability. </br>Notified R3DO (Passehl).ment capability. Notified R3DO (Passehl).  +
14:15:00, 10 May 2011  +
46,833  +
09:10:00, 10 May 2011  +
14:15:00, 10 May 2011  +
Dose assessment cannot be performed onsiteDose assessment cannot be performed onsite.</br>Pursuant to 10CFR50.72 (b)(3)(xiii), Monticello Nuclear Generating Plant is reporting a planned loss of emergency assessment capability scheduled for 0915 hours on May 10, 2011 for system maintenance. Dose assessment in the control room, TSC, and EOF are non-functional. Main meteorological tower data is unavailable. Projected outage duration is approximately 7 hours. Control room and local instrumentation/annunciation remain available for accident assessment. Telephone lines remain available between site emergency response facilities and offsite agencies for communication of plant status information. Dose assessment capabilities will exist at the backup EOF. Backup meteorological data will be available in the control room, TSC, and EOF. </br>The licensee will not be in any Technical Specification action statements as a result of this evolution. </br>The NRC Resident Inspector has been notified.</br> * * * UPDATE FROM JEFF OLSON TO PETE SNYDER ON 5/10/11 AT 1650 EDT * * * </br>The licensee has restored their dose assessment capability. </br>Notified R3DO (Passehl).ment capability. Notified R3DO (Passehl).  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
0.0106 d (0.254 hours, 0.00151 weeks, 3.481575e-4 months)  +  and 8.101852e-5 d (0.00194 hours, 1.157407e-5 weeks, 2.6635e-6 months)  +
00:00:00, 10 May 2011  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:07:13, 2 March 2018  +
09:10:00, 10 May 2011  +
false  +
false  +
-0.212 d (-5.08 hours, -0.0302 weeks, -0.00696 months)  +
14:15:00, 10 May 2011  +
Loss of Emergency Assessment Capability  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +