Browse wiki
Jump to navigation
Jump to search
100 +
At 2159 CST on 2/27/2011, during the testi … At 2159 CST on 2/27/2011, during the testing of the 'A' Train Safety Injection System, an Auxiliary Operator in the field identified that the oiler for 2P-15B, 'B' Train Safety Injection Pump, had rotated and the oil had drained out of the oiler. The Auxiliary Operator immediately reported this condition to control room personnel. The 'B' train safety injection pump was declared inoperable and LCO 3.0.3 was entered based upon the condition of both trains of safety injection being out of service. The Unit 2 'A' Train Safety Injection System was being tested in accordance with inservice testing procedure IT-535C, Leakage Reduction and Preventive Maintenance Program Train 'A' HHSI and RHR Piggyback Test Mode 1,5,6 (Refueling) Unit 2, which placed the Unit 2 ECCS in TSAC (Technical Specification Action Condition) 3.5.2.A, One ECCS Train Inoperable. </br>Unit 2 exited LCO 3.0.3 at 2211 CST, upon completion of the 'A' train inservice test. The 2P-151B safety injection pump remains inoperable in accordance with TSAC 3.5.2.A, One ECCS Train Inoperable for troubleshooting and repair. This condition is reported in accordance with 10 CFR 50.72(b)(3)(v)(D) Accident Mitigation.</br>There was no impact on Unit 1 and the licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector. +
03:59:00, 28 February 2011 +
03:45:00, 28 February 2011 +
03:59:00, 28 February 2011 +
At 2159 CST on 2/27/2011, during the testi … At 2159 CST on 2/27/2011, during the testing of the 'A' Train Safety Injection System, an Auxiliary Operator in the field identified that the oiler for 2P-15B, 'B' Train Safety Injection Pump, had rotated and the oil had drained out of the oiler. The Auxiliary Operator immediately reported this condition to control room personnel. The 'B' train safety injection pump was declared inoperable and LCO 3.0.3 was entered based upon the condition of both trains of safety injection being out of service. The Unit 2 'A' Train Safety Injection System was being tested in accordance with inservice testing procedure IT-535C, Leakage Reduction and Preventive Maintenance Program Train 'A' HHSI and RHR Piggyback Test Mode 1,5,6 (Refueling) Unit 2, which placed the Unit 2 ECCS in TSAC (Technical Specification Action Condition) 3.5.2.A, One ECCS Train Inoperable. </br>Unit 2 exited LCO 3.0.3 at 2211 CST, upon completion of the 'A' train inservice test. The 2P-151B safety injection pump remains inoperable in accordance with TSAC 3.5.2.A, One ECCS Train Inoperable for troubleshooting and repair. This condition is reported in accordance with 10 CFR 50.72(b)(3)(v)(D) Accident Mitigation.</br>There was no impact on Unit 1 and the licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100 +
00:00:00, 28 February 2011 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:07:44, 2 March 2018 +
03:45:00, 28 February 2011 +
true +
false +
-0.00958 d (-0.23 hours, -0.00137 weeks, -3.15054e-4 months) +
03:59:00, 28 February 2011 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.