Browse wiki

Jump to navigation Jump to search
90  +  and 100  +
The 1B and 2B trains of Nuclear Service WaThe 1B and 2B trains of Nuclear Service Water Systems (Raw Water Nuclear RN) were declared inoperable on 1/18/11 at 0423 EST due to fouling of the respective suction strainers when aligned to the Standby Nuclear Service Water Pond (SNSWP).</br>Tech. Spec. 3.0.3 was entered at 1110 EST on 1/20/11 due to the lack of reasonable assurance of operability pertaining to 1A and 2A RN trains in the event of a potential realignment to the SNSWP due to a seismic event.</br>The licensee plans to reduce power and place both Units in Mode 5. Unit 1 has been reduced to 90% and Unit 2 is holding at 100% and will begin reducing power later. The fouling is being caused by fish being sucked into the RN train suction strainers. The licensee has been back-flushing the strainers to clear the fouling. The pond was chemically treated approximately 1 year ago to eliminate the fish.</br>The licensee notified the NRC Resident Inspector.</br>* * * UPDATE FROM TERESA PUTNAM TO JOHN KNOKE AT 1313 EST ON 01/21/11 * * *</br>McGuire Units 1 & 2 entered Technical Specification 3.0.3 with a requirement to be in Mode 5 in 37 hours. A Notification of Enforcement Discretion was verbally approved by the Nuclear Regulatory Commission on 1/20/11 at 2336 EST, therefore both Unit 1 & 2 will remain in Mode 3.</br>The licensee notified the NRC Resident Inspector. Notified R2DO (Sykes), NRR EO (Thomas), and IRD MOC (Gott)</br>* * * UPDATE FROM TERESA PUTNAM TO JOHN KNOKE AT 1313 EST ON 01/24/11 * * *</br>This is an amendment to Event Notification #46557 to include the following 8 hour non-emergency notifications previously omitted by the NRC from the event report:</br>50.72(b)(3)(v)(A) POT UNABLE TO SAFE S/D</br>50.72(b)(3)(v)(B) POT RHR INOP</br>50.72(b)(3)(v)(D) ACCIDENT MITIGATION</br>The licensee will notify the NRC Resident Inspector.e licensee will notify the NRC Resident Inspector.  +
16:10:00, 20 January 2011  +
46,557  +
12:46:00, 20 January 2011  +
16:10:00, 20 January 2011  +
The 1B and 2B trains of Nuclear Service WaThe 1B and 2B trains of Nuclear Service Water Systems (Raw Water Nuclear RN) were declared inoperable on 1/18/11 at 0423 EST due to fouling of the respective suction strainers when aligned to the Standby Nuclear Service Water Pond (SNSWP).</br>Tech. Spec. 3.0.3 was entered at 1110 EST on 1/20/11 due to the lack of reasonable assurance of operability pertaining to 1A and 2A RN trains in the event of a potential realignment to the SNSWP due to a seismic event.</br>The licensee plans to reduce power and place both Units in Mode 5. Unit 1 has been reduced to 90% and Unit 2 is holding at 100% and will begin reducing power later. The fouling is being caused by fish being sucked into the RN train suction strainers. The licensee has been back-flushing the strainers to clear the fouling. The pond was chemically treated approximately 1 year ago to eliminate the fish.</br>The licensee notified the NRC Resident Inspector.</br>* * * UPDATE FROM TERESA PUTNAM TO JOHN KNOKE AT 1313 EST ON 01/21/11 * * *</br>McGuire Units 1 & 2 entered Technical Specification 3.0.3 with a requirement to be in Mode 5 in 37 hours. A Notification of Enforcement Discretion was verbally approved by the Nuclear Regulatory Commission on 1/20/11 at 2336 EST, therefore both Unit 1 & 2 will remain in Mode 3.</br>The licensee notified the NRC Resident Inspector. Notified R2DO (Sykes), NRR EO (Thomas), and IRD MOC (Gott)</br>* * * UPDATE FROM TERESA PUTNAM TO JOHN KNOKE AT 1313 EST ON 01/24/11 * * *</br>This is an amendment to Event Notification #46557 to include the following 8 hour non-emergency notifications previously omitted by the NRC from the event report:</br>50.72(b)(3)(v)(A) POT UNABLE TO SAFE S/D</br>50.72(b)(3)(v)(B) POT RHR INOP</br>50.72(b)(3)(v)(D) ACCIDENT MITIGATION</br>The licensee will notify the NRC Resident Inspector.e licensee will notify the NRC Resident Inspector.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
4.282407e-4 d (0.0103 hours, 6.117725e-5 weeks, 1.40785e-5 months)  +  and 9.259259e-5 d (0.00222 hours, 1.322751e-5 weeks, 3.044e-6 months)  +
100  +
00:00:00, 24 January 2011  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:28:45, 24 September 2017  +
12:46:00, 20 January 2011  +
false  +
-0.142 d (-3.4 hours, -0.0202 weeks, -0.00466 months)  +
16:10:00, 20 January 2011  +
Technical Specification Required Shutdown  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +  and 2  +