On 8/6/10 at 0700 CDT the Monticello NucleOn 8/6/10 at 0700 CDT the Monticello Nuclear Generating Plant's (MNGP) Technical Support Center uninterruptible power supply will be isolated to perform a planned maintenance activity. The maintenance activity requires implementation of compensatory measures to maintain TSC functions during the activity. The compensatory measures include having the Emergency Director report to the Control Room and co-locating the remaining TSC staff at the EOF should an event be declared requiring ERO activation. The ERO has previously successfully demonstrated the ability to implement these compensatory measures. The maintenance activity is scheduled to be completed with the TSC returned to full functionality by the end of the dayshift on 8/6/10. The Site Emergency Response Organization has been notified of the maintenance activity and instructed on the planned compensatory measures to be implemented during the activity. MNGP will notify the NRC upon completion of the activity restoring full TSC operability. This event is considered reportable per 10CFR50.72(b)(3)(xiii). The licensee has notified the NRC Resident Inspector.</br>The licensee will inform both State and local agencies.</br>* * * UPDATE AT 2015 EDT ON 8/6/10 FROM MARTIN RAJKOWSKI TO S. SANDIN * * *</br>On 8/6/10 at 1705 CDT the Monticello Nuclear Generating Plant's Technical Support Center was returned to full operability. The Monticello Emergency Response Organization has been notified and the compensatory measures that were in effect have been terminated. The licensee has notified the NRC Resident Inspector.</br>The licensee will inform both State and local agencies. Notified R3DO (Stone).nd local agencies. Notified R3DO (Stone).  +
12:00:00, 6 August 2010  +
46,152  +
13:43:00, 5 August 2010  +
12:00:00, 6 August 2010  +
On 8/6/10 at 0700 CDT the Monticello NucleOn 8/6/10 at 0700 CDT the Monticello Nuclear Generating Plant's (MNGP) Technical Support Center uninterruptible power supply will be isolated to perform a planned maintenance activity. The maintenance activity requires implementation of compensatory measures to maintain TSC functions during the activity. The compensatory measures include having the Emergency Director report to the Control Room and co-locating the remaining TSC staff at the EOF should an event be declared requiring ERO activation. The ERO has previously successfully demonstrated the ability to implement these compensatory measures. The maintenance activity is scheduled to be completed with the TSC returned to full functionality by the end of the dayshift on 8/6/10. The Site Emergency Response Organization has been notified of the maintenance activity and instructed on the planned compensatory measures to be implemented during the activity. MNGP will notify the NRC upon completion of the activity restoring full TSC operability. This event is considered reportable per 10CFR50.72(b)(3)(xiii). The licensee has notified the NRC Resident Inspector.</br>The licensee will inform both State and local agencies.</br>* * * UPDATE AT 2015 EDT ON 8/6/10 FROM MARTIN RAJKOWSKI TO S. SANDIN * * *</br>On 8/6/10 at 1705 CDT the Monticello Nuclear Generating Plant's Technical Support Center was returned to full operability. The Monticello Emergency Response Organization has been notified and the compensatory measures that were in effect have been terminated. The licensee has notified the NRC Resident Inspector.</br>The licensee will inform both State and local agencies. Notified R3DO (Stone).nd local agencies. Notified R3DO (Stone).  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100  +
00:00:00, 6 August 2010  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:29:42, 24 September 2017  +
13:43:00, 5 August 2010  +
false  +
-0.928 d (-22.28 hours, -0.133 weeks, -0.0305 months)  +
12:00:00, 6 August 2010  +
Technical Support Center (Tsc) Planned Maintenance Activity  +