Browse wiki
Jump to navigation
Jump to search
The following is a summary of information … The following is a summary of information received via fax:</br>UCI (United Controls International) personnel witnessed system level functional testing of three (Modulation Index Control) MIC circuit boards in a spare unit on March 9-10, 2010 at the PSEG Nuclear LLC training center as part of the dedication process. Initially, the boards were accepted based on the test results but later irregularities were noticed on the output side of another card (reference oscillator) in the system. The Original Equipment Manufacture (Thomas & Betts) began troubleshooting the issue and determined that two resistors (R336 and R347) had one leg each terminated in the wrong location. Subsequent repair and testing confirmed this to be the issue and that once corrected, the irregularities were gone.</br>The affected licensees are PSEG Nuclear LLC - Salem and Hope Creek Nuclear Generating Stations.em and Hope Creek Nuclear Generating Stations. +
04:00:00, 9 March 2010 +
45,839 +
16:49:00, 14 April 2010 +
04:00:00, 9 March 2010 +
The following is a summary of information … The following is a summary of information received via fax:</br>UCI (United Controls International) personnel witnessed system level functional testing of three (Modulation Index Control) MIC circuit boards in a spare unit on March 9-10, 2010 at the PSEG Nuclear LLC training center as part of the dedication process. Initially, the boards were accepted based on the test results but later irregularities were noticed on the output side of another card (reference oscillator) in the system. The Original Equipment Manufacture (Thomas & Betts) began troubleshooting the issue and determined that two resistors (R336 and R347) had one leg each terminated in the wrong location. Subsequent repair and testing confirmed this to be the issue and that once corrected, the irregularities were gone.</br>The affected licensees are PSEG Nuclear LLC - Salem and Hope Creek Nuclear Generating Stations.em and Hope Creek Nuclear Generating Stations. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 14 April 2010 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:09:54, 2 March 2018 +
16:49:00, 14 April 2010 +
36.576 d (877.82 hours, 5.225 weeks, 1.202 months) +
04:00:00, 9 March 2010 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.