Browse wiki
Jump to navigation
Jump to search
100 +
At 1300 hrs. on Thursday, September 17, 20 … At 1300 hrs. on Thursday, September 17, 2009, TMI Unit 1 determined that there had been a degradation of the emergency preparedness response capabilities when a loss of the Emergency Response Data System (ERDS) was identified. While preparing for a future job in the same cabinet where the ERDS modem is located, technicians identified that the phone line for the ERDS modem was not connected. </br>At 1400, the phone line was reconnected to the modem. After coordination with the NRC Operations Center testing personnel, a test of the ERDS system was initiated. At 1414, an active link was established. A successful ERDS link was confirmed with the NRC Operations Center. At 1426, the ERDS link was terminated.</br>Work was performed on different equipment in the cabinet containing the ERDS modem on approximately September 1, 2009. It is probable that the phone line was inadvertently disconnected from the ERDS modem at that time. The last scheduled quarterly test was successfully completed on July 9, 2009. TMI 1 has determined that this event is reportable to the NRC as an 8-hour non-emergency report in accordance with 10 CFR 50.72 (b)(3)(xiii). </br>The licensee has notified the NRC Resident Inspector.e has notified the NRC Resident Inspector. +
17:00:00, 17 September 2009 +
45,359 +
16:16:00, 17 September 2009 +
17:00:00, 17 September 2009 +
At 1300 hrs. on Thursday, September 17, 20 … At 1300 hrs. on Thursday, September 17, 2009, TMI Unit 1 determined that there had been a degradation of the emergency preparedness response capabilities when a loss of the Emergency Response Data System (ERDS) was identified. While preparing for a future job in the same cabinet where the ERDS modem is located, technicians identified that the phone line for the ERDS modem was not connected. </br>At 1400, the phone line was reconnected to the modem. After coordination with the NRC Operations Center testing personnel, a test of the ERDS system was initiated. At 1414, an active link was established. A successful ERDS link was confirmed with the NRC Operations Center. At 1426, the ERDS link was terminated.</br>Work was performed on different equipment in the cabinet containing the ERDS modem on approximately September 1, 2009. It is probable that the phone line was inadvertently disconnected from the ERDS modem at that time. The last scheduled quarterly test was successfully completed on July 9, 2009. TMI 1 has determined that this event is reportable to the NRC as an 8-hour non-emergency report in accordance with 10 CFR 50.72 (b)(3)(xiii). </br>The licensee has notified the NRC Resident Inspector.e has notified the NRC Resident Inspector. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100 +
00:00:00, 17 September 2009 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:11:15, 2 March 2018 +
16:16:00, 17 September 2009 +
true +
false +
-0.0304 d (-0.73 hours, -0.00435 weeks, -9.99954e-4 months) +
17:00:00, 17 September 2009 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.