At 1546 CDT the control room at the Fort C … At 1546 CDT the control room at the Fort Calhoun Power Station was notified that a siren test conducted at 1440 CDT had failed. At this time none of the station's emergency sirens are capable of being sounded. Utility personnel are troubleshooting the problem and expect to restore siren capability. Compensatory measures have been implemented. The NRC will be notified when siren capability has been restored.</br>Harrison and Pattawattamie counties in Iowa, and Washington county in Nebraska have been notified.</br>The NRC resident inspector has been notified.</br>* * * UPDATE ON 08/31/09 AT 2055 EDT FROM ALAN PALLAS TO HUFFMAN * * *</br>The licensee has reset a communications device that activates the sirens and restored operability to 38 out of the 103 total sirens around the site. To re-establish operability of the remaining sirens, the licensee will need to dispatch personnel to each siren to relink with the communications system. The time frame to complete this effort is estimated to be approximately 5 hours. The compensatory notification measures will remain in place until the sirens have been restored.</br>The licensee will notify the Resident Inspector of this updated information.</br>* * * UPDATE ON 09/01/09 AT 0236 EDT FROM ALAN PALLAS TO PARK * * *</br>The licensee has restored 101 of 103 total sirens to service. Two sirens that are not in service are currently not accessible. They will be automatically restored to service at approximately 0330 CDT and verified in the morning. </br>The licensee has notified the Resident Inspector of this updated information.</br>Notified R4DO (Farnholtz).</br>* * * UPDATE ON 09/01/09 AT 0943 EDT FROM ERICK MATZKE TO PARK * * *</br>The licensee has restored all 103 of 103 total sirens to service. Harrison and Pattawattamie counties in Iowa, and Washington county in Nebraska have been notified.</br>The licensee will notify the NRC Resident Inspector of this updated information.</br>Notified R4DO (Farnholtz).ed information.
Notified R4DO (Farnholtz). +
05:00:00, 31 August 2009 +
45,315 +
18:03:00, 31 August 2009 +
05:00:00, 31 August 2009 +
At 1546 CDT the control room at the Fort C … At 1546 CDT the control room at the Fort Calhoun Power Station was notified that a siren test conducted at 1440 CDT had failed. At this time none of the station's emergency sirens are capable of being sounded. Utility personnel are troubleshooting the problem and expect to restore siren capability. Compensatory measures have been implemented. The NRC will be notified when siren capability has been restored.</br>Harrison and Pattawattamie counties in Iowa, and Washington county in Nebraska have been notified.</br>The NRC resident inspector has been notified.</br>* * * UPDATE ON 08/31/09 AT 2055 EDT FROM ALAN PALLAS TO HUFFMAN * * *</br>The licensee has reset a communications device that activates the sirens and restored operability to 38 out of the 103 total sirens around the site. To re-establish operability of the remaining sirens, the licensee will need to dispatch personnel to each siren to relink with the communications system. The time frame to complete this effort is estimated to be approximately 5 hours. The compensatory notification measures will remain in place until the sirens have been restored.</br>The licensee will notify the Resident Inspector of this updated information.</br>* * * UPDATE ON 09/01/09 AT 0236 EDT FROM ALAN PALLAS TO PARK * * *</br>The licensee has restored 101 of 103 total sirens to service. Two sirens that are not in service are currently not accessible. They will be automatically restored to service at approximately 0330 CDT and verified in the morning. </br>The licensee has notified the Resident Inspector of this updated information.</br>Notified R4DO (Farnholtz).</br>* * * UPDATE ON 09/01/09 AT 0943 EDT FROM ERICK MATZKE TO PARK * * *</br>The licensee has restored all 103 of 103 total sirens to service. Harrison and Pattawattamie counties in Iowa, and Washington county in Nebraska have been notified.</br>The licensee will notify the NRC Resident Inspector of this updated information.</br>Notified R4DO (Farnholtz).ed information.
Notified R4DO (Farnholtz). +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100 +
00:00:00, 1 September 2009 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:31:48, 24 September 2017 +
18:03:00, 31 August 2009 +
true +
false +
0.544 d (13.05 hours, 0.0777 weeks, 0.0179 months) +
05:00:00, 31 August 2009 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.