Browse wiki
Jump to navigation
Jump to search
100 +
On Monday, July 27, 2009, at 0752, Seabroo … On Monday, July 27, 2009, at 0752, Seabrook Station is temporarily relocating its Technical Support Center (TSC) from the permanent location on the 75 foot level of the Control Building (CB) to an alternate location in the Online/Outage Control Center (OCC). This relocation is necessary to allow for installation of new equipment and upgrading of existing equipment in the TSC. </br>The site Emergency Response Organization (ERO) has been notified of the modifications and has been instructed on the planned compensatory measure to be implemented during the temporary relocation.</br>The NRC Resident Inspector has been notified of the relocation activities.</br>This notification is being made in accordance with 10 CFR 50.72(b)(3)(xiii) due to loss of the emergency response facility.</br>Seabrook Station will provide updates as necessary and will advise the NRC of the restoration of the permanent TSC.</br>The State of New Hampshire has been notified.</br>* * * UPDATE FROM MARK HANSEN TO JOE O'HARA AT 1635 ON 7/30/09 * * * </br>On Thursday. July 30. 2009. Seabrook Station completed modifications of its Technical Support Center (TSC) and has restored the TSC permanent location on the 75 foot level of the Control Building (CB) to service. The permanent TSC was declared operable at 1456 on Thursday July 30, 2009.</br>The site Emergency Response Organization (ERO) has been notified that the modifications to the permanent TSC have been completed, that compensatory measures are no longer necessary and that TSC personnel are to report to the permanent TSC in the case of a plant emergency.</br>The NRC Resident Inspector has been notified that the permanent TSC has been restored to service.</br>The State of New Hampshire and the Commonwealth of Massachusetts have been notified. Notified R1DO (A. Dimitriadis).notified. Notified R1DO (A. Dimitriadis). +
11:52:00, 27 July 2009 +
45,229 +
09:52:00, 27 July 2009 +
11:52:00, 27 July 2009 +
On Monday, July 27, 2009, at 0752, Seabroo … On Monday, July 27, 2009, at 0752, Seabrook Station is temporarily relocating its Technical Support Center (TSC) from the permanent location on the 75 foot level of the Control Building (CB) to an alternate location in the Online/Outage Control Center (OCC). This relocation is necessary to allow for installation of new equipment and upgrading of existing equipment in the TSC. </br>The site Emergency Response Organization (ERO) has been notified of the modifications and has been instructed on the planned compensatory measure to be implemented during the temporary relocation.</br>The NRC Resident Inspector has been notified of the relocation activities.</br>This notification is being made in accordance with 10 CFR 50.72(b)(3)(xiii) due to loss of the emergency response facility.</br>Seabrook Station will provide updates as necessary and will advise the NRC of the restoration of the permanent TSC.</br>The State of New Hampshire has been notified.</br>* * * UPDATE FROM MARK HANSEN TO JOE O'HARA AT 1635 ON 7/30/09 * * * </br>On Thursday. July 30. 2009. Seabrook Station completed modifications of its Technical Support Center (TSC) and has restored the TSC permanent location on the 75 foot level of the Control Building (CB) to service. The permanent TSC was declared operable at 1456 on Thursday July 30, 2009.</br>The site Emergency Response Organization (ERO) has been notified that the modifications to the permanent TSC have been completed, that compensatory measures are no longer necessary and that TSC personnel are to report to the permanent TSC in the case of a plant emergency.</br>The NRC Resident Inspector has been notified that the permanent TSC has been restored to service.</br>The State of New Hampshire and the Commonwealth of Massachusetts have been notified. Notified R1DO (A. Dimitriadis).notified. Notified R1DO (A. Dimitriadis). +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
100 +
00:00:00, 30 July 2009 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:11:35, 2 March 2018 +
09:52:00, 27 July 2009 +
true +
false +
-0.0833 d (-2 hours, -0.0119 weeks, -0.00274 months) +
11:52:00, 27 July 2009 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.