Browse wiki

Jump to navigation Jump to search
On August 19, 2008, with the Unit shut dowOn August 19, 2008, with the Unit shut down in Mode 3, post maintenance testing was being performed for the Digital Rod Position Indication System. While performing this test, a 'Rod Control Urgent Failure' alarm was received upon initial withdrawal of Control Bank-C. All other control and shutdown banks remained fully inserted in the core. Local inspection revealed a phase failure on movable gripper coils in a power cabinet. In accordance with plant procedures, at 0905 hours, a manual reactor trip was initiated by operators opening the reactor trip breakers. All Safety Systems functioned as designed and Rod Control System repairs are in progress.</br>This event posed no significant safety implications because the reactor was subcritical when the reactor trip breakers were opened. Compliance with all Technical Specification requirements was maintained. The health and safety of the public were not affected by this event.</br>The NRC Resident Inspector was notified.. The NRC Resident Inspector was notified.  +
13:05:00, 19 August 2008  +
44,423  +
15:07:00, 19 August 2008  +
13:05:00, 19 August 2008  +
On August 19, 2008, with the Unit shut dowOn August 19, 2008, with the Unit shut down in Mode 3, post maintenance testing was being performed for the Digital Rod Position Indication System. While performing this test, a 'Rod Control Urgent Failure' alarm was received upon initial withdrawal of Control Bank-C. All other control and shutdown banks remained fully inserted in the core. Local inspection revealed a phase failure on movable gripper coils in a power cabinet. In accordance with plant procedures, at 0905 hours, a manual reactor trip was initiated by operators opening the reactor trip breakers. All Safety Systems functioned as designed and Rod Control System repairs are in progress.</br>This event posed no significant safety implications because the reactor was subcritical when the reactor trip breakers were opened. Compliance with all Technical Specification requirements was maintained. The health and safety of the public were not affected by this event.</br>The NRC Resident Inspector was notified.. The NRC Resident Inspector was notified.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
0.0105 d (0.251 hours, 0.0015 weeks, 3.443525e-4 months)  +
00:00:00, 19 August 2008  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:34:05, 24 September 2017  +
15:07:00, 19 August 2008  +
false  +
true  +
0.0846 d (2.03 hours, 0.0121 weeks, 0.00278 months)  +
13:05:00, 19 August 2008  +
Rod Control System Malfunctioned  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +