Browse wiki

Jump to navigation Jump to search
At 0451 (EST, the licensee) entered into At 0451 (EST, the licensee) entered into (Technical Specification (TS)) 3.0.3 due to observed RPI B-10 erratic indication. This RPI is in the same bank as currently inoperable F-2 RPI. TS 3.1.3.2 has actions for a maximum of one RPI per bank inoperable. Since there are two (RPIs inoperable) in one bank, an entry into TS 3.0.3 is required.</br>Power reduction was initiated at 0541.</br>Repairs are currently in progress and (the licensee) anticipates correction prior to completion of the power reduction.</br>The licensee notified the NRC Resident Inspector.</br>See event notification #43888 for similar report.</br>* * * UPDATE FROM DAVID FUNK TO HOWIE CROUCH ON 01/12/08 AT 1049 EST * * *</br>Repairs have been completed and B-10 Rod Position Indicator has been returned to service. At 1010 EST, the licensee exited TS 3.0.3 and power ascension to 100% is in progress.</br>The licensee has notified the NRC Resident Inspector. Notified R2DO (Widmann).ident Inspector. Notified R2DO (Widmann).  +
10:41:00, 12 January 2008  +
43,896  +
07:37:00, 12 January 2008  +
10:41:00, 12 January 2008  +
At 0451 (EST, the licensee) entered into At 0451 (EST, the licensee) entered into (Technical Specification (TS)) 3.0.3 due to observed RPI B-10 erratic indication. This RPI is in the same bank as currently inoperable F-2 RPI. TS 3.1.3.2 has actions for a maximum of one RPI per bank inoperable. Since there are two (RPIs inoperable) in one bank, an entry into TS 3.0.3 is required.</br>Power reduction was initiated at 0541.</br>Repairs are currently in progress and (the licensee) anticipates correction prior to completion of the power reduction.</br>The licensee notified the NRC Resident Inspector.</br>See event notification #43888 for similar report.</br>* * * UPDATE FROM DAVID FUNK TO HOWIE CROUCH ON 01/12/08 AT 1049 EST * * *</br>Repairs have been completed and B-10 Rod Position Indicator has been returned to service. At 1010 EST, the licensee exited TS 3.0.3 and power ascension to 100% is in progress.</br>The licensee has notified the NRC Resident Inspector. Notified R2DO (Widmann).ident Inspector. Notified R2DO (Widmann).  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 12 January 2008  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:15:16, 2 March 2018  +
07:37:00, 12 January 2008  +
false  +
-0.128 d (-3.07 hours, -0.0183 weeks, -0.00421 months)  +
10:41:00, 12 January 2008  +
Technical Specification Required Shutdown Due to Two Rod Position Indicators (Rpis) Out in One Rod Bank  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
3  +