Browse wiki

Jump to navigation Jump to search
On 12/06/2007 at 2042 (CST) C-337 unit 5 cOn 12/06/2007 at 2042 (CST) C-337 unit 5 cell 5 was being charged and placed on stream and had just gone above atmospheric pressure. At 2044 hours two PGLD (process gas leak detection) heads in the C-337 unit 5 cell 5 actuated and would not clear indicating a potential UF6 release. To stop the release the cell was immediately taken back below atmospheric pressure. Investigation revealed that a UF6 release had occurred causing the PGLD actuation. The amount of material released has not yet been determined.</br>The PGLD heads are Q safety system components. At the time of the incident the cell was operating in a mode which required the system to be operational. This is being reported based on SAR 6.9 Table 1, J2 (unplanned actuation of a Q safety system) and 10 CFR 76.120 (c) (1) (i) (unplanned contamination event).</br>The NRC Resident Inspector has been notified of this event.</br>There was no release to the environment and no personnel contaminations reported. and no personnel contaminations reported.  +
02:44:00, 7 December 2007  +
43,829  +
15:47:00, 7 December 2007  +
02:44:00, 7 December 2007  +
On 12/06/2007 at 2042 (CST) C-337 unit 5 cOn 12/06/2007 at 2042 (CST) C-337 unit 5 cell 5 was being charged and placed on stream and had just gone above atmospheric pressure. At 2044 hours two PGLD (process gas leak detection) heads in the C-337 unit 5 cell 5 actuated and would not clear indicating a potential UF6 release. To stop the release the cell was immediately taken back below atmospheric pressure. Investigation revealed that a UF6 release had occurred causing the PGLD actuation. The amount of material released has not yet been determined.</br>The PGLD heads are Q safety system components. At the time of the incident the cell was operating in a mode which required the system to be operational. This is being reported based on SAR 6.9 Table 1, J2 (unplanned actuation of a Q safety system) and 10 CFR 76.120 (c) (1) (i) (unplanned contamination event).</br>The NRC Resident Inspector has been notified of this event.</br>There was no release to the environment and no personnel contaminations reported. and no personnel contaminations reported.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
0.0237 d (0.568 hours, 0.00338 weeks, 7.77742e-4 months)  +
00:00:00, 7 December 2007  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
23:30:56, 24 November 2018  +
15:47:00, 7 December 2007  +
0.544 d (13.05 hours, 0.0777 weeks, 0.0179 months)  +
02:44:00, 7 December 2007  +
Unplanned Safety System Actuation and Contamination Event  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.