At 1643 CDST, on 10-05-07 the Plant Shift … At 1643 CDST, on 10-05-07 the Plant Shift Superintendent (PSS) was notified that an alarm was received for the C-333 Unit 6 Cell 8 UF6 (Process Gas Leak) Detection (PGLD) System. Operators responded and found that the READY and MANUAL lights for this system were not illuminated. This PGLD System contains detectors that cover C-333 Unit 6 Cell 8 and Section 4 of the cell bypass piping. At the time of this alarm, unit 6 cell 8 and some areas of Section 4 of the cell bypass were operating above atmospheric pressure." </br>Electricians are currently troubleshooting to determine the source of the potential short circuit that caused the problem.</br>(Technical Safety Requirement) (TSR) 2.4.4.1 requires that at least the minimum number of detector heads in the cell and in each defined section of the cell bypass are operable during steady state operations above atmospheric pressure. With the Unit 6 Cell 8 PGLD system inoperable, none of the required cell heads and only 2 of the required 3 heads in Section 4 of the cell bypass were operable. This PGLD System was declared inoperable, TSR LCO 2.4.4.1.C.1 was entered and a continuous smoke watch was put in place within one hour.</br>Engineering has determined that the system would not have been able to perform its intended safety function when this alarm came in. This event is reportable as a 24 hour event in accordance with 10 CFR 76.120(c)(2)(i). This is an event in which equipment is disabled or fails to function as designed when: </br>a. The equipment is required by a TSR to prevent releases, prevent exposures to radiation and radioactive materials exceeding specified limits, mitigate the consequences of an accident, or restore this facility to a pre-established safe condition after an accident;</br> </br>b. the equipment is required by a TSR to be available and operable and either should have been operating or should have operated on demand; and </br>c. no redundant equipment is available and operable to perform the required safety function.</br>The NRC Resident Inspector has been notified of this event. PGDP Assessment and Tracking Report No. ATR-07-2655; PGDP Event Report No. PAD-2007-15; Responsible Division: Operations.2007-15; Responsible Division: Operations.
21:43:00, 5 October 2007 +
43,696 +
11:50:00, 6 October 2007 +
21:43:00, 5 October 2007 +
At 1643 CDST, on 10-05-07 the Plant Shift … At 1643 CDST, on 10-05-07 the Plant Shift Superintendent (PSS) was notified that an alarm was received for the C-333 Unit 6 Cell 8 UF6 (Process Gas Leak) Detection (PGLD) System. Operators responded and found that the READY and MANUAL lights for this system were not illuminated. This PGLD System contains detectors that cover C-333 Unit 6 Cell 8 and Section 4 of the cell bypass piping. At the time of this alarm, unit 6 cell 8 and some areas of Section 4 of the cell bypass were operating above atmospheric pressure." </br>Electricians are currently troubleshooting to determine the source of the potential short circuit that caused the problem.</br>(Technical Safety Requirement) (TSR) 2.4.4.1 requires that at least the minimum number of detector heads in the cell and in each defined section of the cell bypass are operable during steady state operations above atmospheric pressure. With the Unit 6 Cell 8 PGLD system inoperable, none of the required cell heads and only 2 of the required 3 heads in Section 4 of the cell bypass were operable. This PGLD System was declared inoperable, TSR LCO 2.4.4.1.C.1 was entered and a continuous smoke watch was put in place within one hour.</br>Engineering has determined that the system would not have been able to perform its intended safety function when this alarm came in. This event is reportable as a 24 hour event in accordance with 10 CFR 76.120(c)(2)(i). This is an event in which equipment is disabled or fails to function as designed when: </br>a. The equipment is required by a TSR to prevent releases, prevent exposures to radiation and radioactive materials exceeding specified limits, mitigate the consequences of an accident, or restore this facility to a pre-established safe condition after an accident;</br> </br>b. the equipment is required by a TSR to be available and operable and either should have been operating or should have operated on demand; and </br>c. no redundant equipment is available and operable to perform the required safety function.</br>The NRC Resident Inspector has been notified of this event. PGDP Assessment and Tracking Report No. ATR-07-2655; PGDP Event Report No. PAD-2007-15; Responsible Division: Operations.2007-15; Responsible Division: Operations.
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 6 October 2007 +
GDP-1 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
23:31:24, 24 November 2018 +
11:50:00, 6 October 2007 +
0.588 d (14.12 hours, 0.084 weeks, 0.0193 months) +
21:43:00, 5 October 2007 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.