At 0500 on 11/09/06, during a routine mont … At 0500 on 11/09/06, during a routine monthly test of the Criticality Warning System (CWS), a segment of the system covering the Dry Conversion Process (DCP) was found to have no functioning evacuation horns. Appropriate personnel were notified, the DCP processes were shut down, DCP personnel evacuated, and the area cordoned off. The activation of the evacuation horns in the balance of the plant were fully functional.</br>A follow-up test was immediately scheduled for 0900. The building was evacuated and the emergency organization assembled in accordance with normal procedures. During this test, the DCP horns again failed to function. </br>The Emergency Director determined that the processes stay shut down and all personnel remain out of the area while investigations and testing were conducted.</br>The problem was located in the interface between the Data Acquisition Modules (DAM's) and the Auto-Call system that initiates the alarm signals. After a repair was completed, a re-test was completed which confirmed functionality of the DCP process area horns.</br>Current plans are to resume normal operations beginning with the 1500 (evening) shift.</br>This event is being reported within 24-hours pursuant to 10CFR70.50(b)(2) as a safety equipment failure.</br>The licensee will notify NRC Region II.e.
The licensee will notify NRC Region II. +
10:00:00, 9 November 2006 +
42,979 +
14:25:00, 9 November 2006 +
10:00:00, 9 November 2006 +
At 0500 on 11/09/06, during a routine mont … At 0500 on 11/09/06, during a routine monthly test of the Criticality Warning System (CWS), a segment of the system covering the Dry Conversion Process (DCP) was found to have no functioning evacuation horns. Appropriate personnel were notified, the DCP processes were shut down, DCP personnel evacuated, and the area cordoned off. The activation of the evacuation horns in the balance of the plant were fully functional.</br>A follow-up test was immediately scheduled for 0900. The building was evacuated and the emergency organization assembled in accordance with normal procedures. During this test, the DCP horns again failed to function. </br>The Emergency Director determined that the processes stay shut down and all personnel remain out of the area while investigations and testing were conducted.</br>The problem was located in the interface between the Data Acquisition Modules (DAM's) and the Auto-Call system that initiates the alarm signals. After a repair was completed, a re-test was completed which confirmed functionality of the DCP process area horns.</br>Current plans are to resume normal operations beginning with the 1500 (evening) shift.</br>This event is being reported within 24-hours pursuant to 10CFR70.50(b)(2) as a safety equipment failure.</br>The licensee will notify NRC Region II.e.
The licensee will notify NRC Region II. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 9 November 2006 +
SNM-1097 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
23:33:52, 24 November 2018 +
14:25:00, 9 November 2006 +
0.184 d (4.42 hours, 0.0263 weeks, 0.00605 months) +
10:00:00, 9 November 2006 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.