PTN (Turkey Point) received a notification … PTN (Turkey Point) received a notification from System Operations that switchyard voltage limits (based upon System Operations Contingency Analysis) was forecasted to exceed switchyard voltage limits if Unit 3 had tripped. This condition existed from 1434 to 1448 on July 8, 2005.</br>At 1915 on July 8, 2005, PTN determined that both Unit 3 and 4 Startup Transformers were inoperable at 1434 on July 8, 2005, and entered Technical Specification 3.8.1.1 action e. This action was to notify the NRC within 4 hours; and to restore at least one of the inoperable Startup Transformers to OPERABLE status within 24 hours. At 1448 on July 8, 2005, both Startup Transformers were declared OPERABLE and PTN exited Technical Specification 3.8.1.1 action e.</br>The licensee stated that the potential for low grid voltage at the Turkey Point Nuclear Plant was based on offsite conditions and was a postulated condition. Low voltage conditions did not actually occur.</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector. +
23:15:00, 8 July 2005 +
41,829 +
22:49:00, 8 July 2005 +
23:15:00, 8 July 2005 +
PTN (Turkey Point) received a notification … PTN (Turkey Point) received a notification from System Operations that switchyard voltage limits (based upon System Operations Contingency Analysis) was forecasted to exceed switchyard voltage limits if Unit 3 had tripped. This condition existed from 1434 to 1448 on July 8, 2005.</br>At 1915 on July 8, 2005, PTN determined that both Unit 3 and 4 Startup Transformers were inoperable at 1434 on July 8, 2005, and entered Technical Specification 3.8.1.1 action e. This action was to notify the NRC within 4 hours; and to restore at least one of the inoperable Startup Transformers to OPERABLE status within 24 hours. At 1448 on July 8, 2005, both Startup Transformers were declared OPERABLE and PTN exited Technical Specification 3.8.1.1 action e.</br>The licensee stated that the potential for low grid voltage at the Turkey Point Nuclear Plant was based on offsite conditions and was a postulated condition. Low voltage conditions did not actually occur.</br>The licensee notified the NRC Resident Inspector.ensee notified the NRC Resident Inspector. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 8 July 2005 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:20:39, 2 March 2018 +
22:49:00, 8 July 2005 +
false +
-0.0179 d (-0.43 hours, -0.00256 weeks, -5.89014e-4 months) +
23:15:00, 8 July 2005 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.