An Engineering Evaluation was initiated toAn Engineering Evaluation was initiated to assess the potential for CO2 (carbon dioxide) migration in the event of a CO2 fire suppression system discharge in the Salem Unit 1 and 2 - 4160 volt or 460 volt Switchgear Rooms or Lower Electrical Penetration Areas. The results presented in the evaluation conservatively identified that when CO2 systems are discharged, CO2 migration can result in concentrations in some adjacent areas that would require the use of self-contained breathing apparatus (SCBAs) for entry, or in some cases should be restricted to transit activities only.</br>Some of these adjacent areas are required to be accessible by operators to perform manual actions in the plant to achieve and maintain safe shutdown. Based on the time line established in the Salem Manual Action Feasibility Studies for operator actions in the response to a fire in a Switchgear Room, the ability to shutdown the plant in the event of a fire concurrent with a CO2 discharge could be impacted.</br>The immediate action is to isolate the CO2 system and implement the necessary compensatory measure for the inoperable CO2 system as delineated within Station Fire protection program. With the CO2 systems isolated, the ability to safely shutdown the plant in the event of a fire in these areas is restored. Additional actions are being evaluated at this time to restore the CO2 system.</br>This event is being reported in accordance with 10CFR50.72(b)(3)(v) and Salem Unit 2 License Condition 2.I. No ESF, ECCS or safety related equipment has been impacted by this condition. Both Units remain at 100% power. There were no personnel injuries associated with this condition.</br>Lower Alloway Creek Township and the State of New Jersey will be notified.</br>The NRC Resident Inspector was notified of this event by the licensee.as notified of this event by the licensee.  +
20:50:00, 26 January 2005  +
41,359  +
17:46:00, 26 January 2005  +
20:50:00, 26 January 2005  +
An Engineering Evaluation was initiated toAn Engineering Evaluation was initiated to assess the potential for CO2 (carbon dioxide) migration in the event of a CO2 fire suppression system discharge in the Salem Unit 1 and 2 - 4160 volt or 460 volt Switchgear Rooms or Lower Electrical Penetration Areas. The results presented in the evaluation conservatively identified that when CO2 systems are discharged, CO2 migration can result in concentrations in some adjacent areas that would require the use of self-contained breathing apparatus (SCBAs) for entry, or in some cases should be restricted to transit activities only.</br>Some of these adjacent areas are required to be accessible by operators to perform manual actions in the plant to achieve and maintain safe shutdown. Based on the time line established in the Salem Manual Action Feasibility Studies for operator actions in the response to a fire in a Switchgear Room, the ability to shutdown the plant in the event of a fire concurrent with a CO2 discharge could be impacted.</br>The immediate action is to isolate the CO2 system and implement the necessary compensatory measure for the inoperable CO2 system as delineated within Station Fire protection program. With the CO2 systems isolated, the ability to safely shutdown the plant in the event of a fire in these areas is restored. Additional actions are being evaluated at this time to restore the CO2 system.</br>This event is being reported in accordance with 10CFR50.72(b)(3)(v) and Salem Unit 2 License Condition 2.I. No ESF, ECCS or safety related equipment has been impacted by this condition. Both Units remain at 100% power. There were no personnel injuries associated with this condition.</br>Lower Alloway Creek Township and the State of New Jersey will be notified.</br>The NRC Resident Inspector was notified of this event by the licensee.as notified of this event by the licensee.  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 26 January 2005  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:21:54, 2 March 2018  +
17:46:00, 26 January 2005  +
false  +
-0.128 d (-3.07 hours, -0.0183 weeks, -0.00421 months)  +
20:50:00, 26 January 2005  +
Potential for Carbon Dioxide Migration Into 4160/460 Volt Switchgear Rooms  +