On November 9, 2004 at 2339 hours, an actu … On November 9, 2004 at 2339 hours, an actuation of the emergency AC electrical power system occurred. While in a refueling outage a planned evolution was in progress to tie 480V Bus 3A to 480V Bus 6A using the tie breaker. A Bus under-voltage condition occurred when the Normal supply breaker was opened to bus 6A. When the normal supply breaker was opened, the tie breaker also opened causing a loss of power to bus 6A. With bus 6A deenergized an under-voltage signal was generated. 21 and 22 Emergency Diesel Generators automatically started and supplied bus sections 5A, 2A, and 3A. 480V Bus 6A remained deenergized because 23 Emergency Diesel Generator was out of service for planned maintenance. As a result, Residual Heat Removal cooling was lost for 5 minutes until power was restored and 21 Residual Heat Removal Pump was started. In addition, normal Spent Fuel Pool Cooling was lost for 39 minutes until 21 Spent Fuel Pool Pump was started. An activity is in progress to determine why the tie breaker opened when the normal supply breaker to Bus 6A was opened.</br>On November 10, 2004 at 0058 hours unit 2 was returned to its normal 480V lineup.</br>At the time of the event, refueling outage 16 was in progress on Unit 2 with all fuel assemblies installed in the core after refueling with the Reactor Vessel Head and Upper Internals removed.</br>This results in a condition that resulted in a valid actuation of the emergency AC electrical power systems which is reportable under 10 CFR 50.72(b)(3)(iv)(A).</br>The loss of the 21 spent fuel pool cooling pump resulted in a 3 degree rise in spent fuel pit temperature. The loss of the 21 RHR pump resulted in no appreciable increase in reactor coolant temperature.</br>The licensee will be notifying the New York Public Service Commission of this incident and has notified the NRC Resident Inspector.d has notified the NRC Resident Inspector. +
04:39:00, 10 November 2004 +
04:05:00, 10 November 2004 +
04:39:00, 10 November 2004 +
On November 9, 2004 at 2339 hours, an actu … On November 9, 2004 at 2339 hours, an actuation of the emergency AC electrical power system occurred. While in a refueling outage a planned evolution was in progress to tie 480V Bus 3A to 480V Bus 6A using the tie breaker. A Bus under-voltage condition occurred when the Normal supply breaker was opened to bus 6A. When the normal supply breaker was opened, the tie breaker also opened causing a loss of power to bus 6A. With bus 6A deenergized an under-voltage signal was generated. 21 and 22 Emergency Diesel Generators automatically started and supplied bus sections 5A, 2A, and 3A. 480V Bus 6A remained deenergized because 23 Emergency Diesel Generator was out of service for planned maintenance. As a result, Residual Heat Removal cooling was lost for 5 minutes until power was restored and 21 Residual Heat Removal Pump was started. In addition, normal Spent Fuel Pool Cooling was lost for 39 minutes until 21 Spent Fuel Pool Pump was started. An activity is in progress to determine why the tie breaker opened when the normal supply breaker to Bus 6A was opened.</br>On November 10, 2004 at 0058 hours unit 2 was returned to its normal 480V lineup.</br>At the time of the event, refueling outage 16 was in progress on Unit 2 with all fuel assemblies installed in the core after refueling with the Reactor Vessel Head and Upper Internals removed.</br>This results in a condition that resulted in a valid actuation of the emergency AC electrical power systems which is reportable under 10 CFR 50.72(b)(3)(iv)(A).</br>The loss of the 21 spent fuel pool cooling pump resulted in a 3 degree rise in spent fuel pit temperature. The loss of the 21 RHR pump resulted in no appreciable increase in reactor coolant temperature.</br>The licensee will be notifying the New York Public Service Commission of this incident and has notified the NRC Resident Inspector.d has notified the NRC Resident Inspector. +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 10 November 2004 +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
02:22:21, 2 March 2018 +
04:05:00, 10 November 2004 +
false +
false +
-0.0238 d (-0.57 hours, -0.00339 weeks, -7.80786e-4 months) +
04:39:00, 10 November 2004 +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.