At 1445 on September 8, 2004, while in ModAt 1445 on September 8, 2004, while in Mode 3 after an unplanned reactor trip during tropical storm Frances, Crystal River Unit 3 experienced a re-actuation of the B-Train of the Emergency Feedwater System. The Emergency Feedwater System had previously actuated during a Loss of Offsite Power experienced during Hurricane Frances and the B-Train actuation had procedurally been bypassed as part of the plant recovery. While In the process of restoring a Main Feedwater Pump to an operating condition, the signal bypassing the B-Train Emergency Feedwater actuation was momentarily removed due to unusual plant conditions present during recovery from the loss of power This resulted in the re-actuation of the B-Train of Emergency Feedwater. This condition is 8-Hour reportable per 10CFR50.72(b)(3)(iv)(B)(6). The re-actuation of the B-Train of Emergency Feedwater did not have a significant impact on plant operation and the associated equipment has been returned to a standby condition.</br>The licensee informed the NRC Resident Inspector.</br>* * * RETRACTION FROM JOHN ADDISON TO BILL HUFFMAN AT 1402 EDT ON 9/30/04 * * *</br>The following information was provided by the licensee via facsimile:</br>At 1823 (hrs. EDT) on 9/8/04, Crystal River Unit 3 made an 8-hour ENS notification in accordance with 10CFR50.72(b)(3)(iv)(A) and 50.72(b)(3)(iv)(B)(6) concerning re-actuation of the B-train of the Emergency Feedwater System. The Emergency Feedwater System had previously actuated during a Loss of Offsite Power experienced during Hurricane Frances and the B-Train actuation had procedurally been bypassed as part of the plant recovery. While in the process of restoring a Main Feedwater Pump to an operating condition, the signal bypassing the B-Train Emergency Feedwater actuation was momentarily removed due to unusual plant conditions present during recovery from the loss of power. This allowed for a re-actuation of the B-Train of Emergency Feedwater based on a loss of Main Feedwater Pump signal. However, the two Main Feedwater Pumps had not been operating since the loss of offsite power that occurred on 9/6/04. The A-Train Emergency Feedwater System had been operating continuously since the initial actuation on the loss of offsite power and continued to operate during and after the re-actuation of the B-Train. Re-actuation of the B-Train has been determined to be an invalid actuation in accordance with the guidance of NUREG-1022, and therefore EN 41027 is retracted.</br>The licensee has informed the NRC resident inspector. R2DO (Lesser) notified.ident inspector. R2DO (Lesser) notified.  
18:45:00, 8 September 2004  +
41,027  +
18:23:00, 8 September 2004  +
18:45:00, 8 September 2004  +
At 1445 on September 8, 2004, while in ModAt 1445 on September 8, 2004, while in Mode 3 after an unplanned reactor trip during tropical storm Frances, Crystal River Unit 3 experienced a re-actuation of the B-Train of the Emergency Feedwater System. The Emergency Feedwater System had previously actuated during a Loss of Offsite Power experienced during Hurricane Frances and the B-Train actuation had procedurally been bypassed as part of the plant recovery. While In the process of restoring a Main Feedwater Pump to an operating condition, the signal bypassing the B-Train Emergency Feedwater actuation was momentarily removed due to unusual plant conditions present during recovery from the loss of power This resulted in the re-actuation of the B-Train of Emergency Feedwater. This condition is 8-Hour reportable per 10CFR50.72(b)(3)(iv)(B)(6). The re-actuation of the B-Train of Emergency Feedwater did not have a significant impact on plant operation and the associated equipment has been returned to a standby condition.</br>The licensee informed the NRC Resident Inspector.</br>* * * RETRACTION FROM JOHN ADDISON TO BILL HUFFMAN AT 1402 EDT ON 9/30/04 * * *</br>The following information was provided by the licensee via facsimile:</br>At 1823 (hrs. EDT) on 9/8/04, Crystal River Unit 3 made an 8-hour ENS notification in accordance with 10CFR50.72(b)(3)(iv)(A) and 50.72(b)(3)(iv)(B)(6) concerning re-actuation of the B-train of the Emergency Feedwater System. The Emergency Feedwater System had previously actuated during a Loss of Offsite Power experienced during Hurricane Frances and the B-Train actuation had procedurally been bypassed as part of the plant recovery. While in the process of restoring a Main Feedwater Pump to an operating condition, the signal bypassing the B-Train Emergency Feedwater actuation was momentarily removed due to unusual plant conditions present during recovery from the loss of power. This allowed for a re-actuation of the B-Train of Emergency Feedwater based on a loss of Main Feedwater Pump signal. However, the two Main Feedwater Pumps had not been operating since the loss of offsite power that occurred on 9/6/04. The A-Train Emergency Feedwater System had been operating continuously since the initial actuation on the loss of offsite power and continued to operate during and after the re-actuation of the B-Train. Re-actuation of the B-Train has been determined to be an invalid actuation in accordance with the guidance of NUREG-1022, and therefore EN 41027 is retracted.</br>The licensee has informed the NRC resident inspector. R2DO (Lesser) notified.ident inspector. R2DO (Lesser) notified.  
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
00:00:00, 30 September 2004  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:42:26, 24 September 2017  +
18:23:00, 8 September 2004  +
false  +
-0.0154 d (-0.37 hours, -0.0022 weeks, -5.06826e-4 months)  +
true  +
18:45:00, 8 September 2004  +
Emergency Feedwater System Actuation  +