Browse wiki

Jump to navigation Jump to search
94  +  and 97  +
See event # 40223, Part 21 reported on 10/See event # 40223, Part 21 reported on 10/04/03 by GE Nuclear Energy for background information.</br>On October 5, 2003, Progress Energy Carolinas, Inc. received notification from General Electric of a Part 21 involving the potential for numerous, unexpected confirmation count (CC) resets in the event of an instability condition. These CC resets may result in the inoperability of TS Table 3.3.1.1-1,'Reactor Protection System Instrumentation, Function 2. f, OPRM Upscale.'</br>All Unit 1 and Unit 2 OPRM channels have been declared inoperable. Technical Specification 3.3.1.1, Action I requires an alternate method of detecting and suppressing thermal hydraulic instabilities to be implemented within 12 hours. The alternate methods of detection and suppression are currently in place.</br>Due to the implementation of Technical Specification required compensatory actions, there is minimal safety significance.</br>The NRC Resident Inspector was notified of this event by the licensee.</br>Also see similar events reported by NMP Unit 2 (event # 40217) and Fermi Unit 2 (event # 40215) # 40217) and Fermi Unit 2 (event # 40215)  +
15:00:00, 5 October 2003  +
40,226  +
12:54:00, 5 October 2003  +
15:00:00, 5 October 2003  +
See event # 40223, Part 21 reported on 10/See event # 40223, Part 21 reported on 10/04/03 by GE Nuclear Energy for background information.</br>On October 5, 2003, Progress Energy Carolinas, Inc. received notification from General Electric of a Part 21 involving the potential for numerous, unexpected confirmation count (CC) resets in the event of an instability condition. These CC resets may result in the inoperability of TS Table 3.3.1.1-1,'Reactor Protection System Instrumentation, Function 2. f, OPRM Upscale.'</br>All Unit 1 and Unit 2 OPRM channels have been declared inoperable. Technical Specification 3.3.1.1, Action I requires an alternate method of detecting and suppressing thermal hydraulic instabilities to be implemented within 12 hours. The alternate methods of detection and suppression are currently in place.</br>Due to the implementation of Technical Specification required compensatory actions, there is minimal safety significance.</br>The NRC Resident Inspector was notified of this event by the licensee.</br>Also see similar events reported by NMP Unit 2 (event # 40217) and Fermi Unit 2 (event # 40215) # 40217) and Fermi Unit 2 (event # 40215)  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
1.388889e-4 d (0.00333 hours, 1.984127e-5 weeks, 4.566e-6 months)  +
94  +  and 97  +
00:00:00, 5 October 2003  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
22:44:37, 24 September 2017  +
12:54:00, 5 October 2003  +
false  +
-0.0875 d (-2.1 hours, -0.0125 weeks, -0.00288 months)  +
15:00:00, 5 October 2003  +
Oscillation Power Range Monitors (Oprm) Declared Inoperable  +
URL"URL" is a <a href="/Special:Types/URL" title="Special:Types/URL">type</a> and predefined property provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a> to represent URI/URL values.
1  +  and 2  +