TS 3.8.1 condition G.1 required that Unit TS 3.8.1 condition G.1 required that Unit 1 shall have restored operability to the 1B DG within 72 hours or be in Mode 3 within six additional hours. Contrary to the above, from 10:32 a.m., on February 26, 2011, until 2:54 p.m., on February 27, 2011, the licensee failed to comply with the required action of TS 3.8.1 condition G.1 to be in Mode 3. The inspectors determined that the violation was not greater than very low safety significance (Green) because the unavailability time incurred to perform the governor replacement did not exceed the TS allowed outage time of 72 hours. The issue is documented in the licensees corrective action program as PIP C-11- 1407.rrective action program as PIP C-11- 1407.  +
23:59:59, 30 September 2011  +
05000413  +  and 05000414  +
23:59:59, 30 September 2011  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
8.333333e-4 d (0.02 hours, 1.190476e-4 weeks, 2.7396e-5 months)  +
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
15:42:53, 30 May 2018  +
23:59:59, 30 September 2011  +
Licensee-Identified Violation  +