10 CFR 50, Appendix B, Criterion III requi10 CFR 50, Appendix B, Criterion III requires in part that design changes, including field changes, shall be subject to design control measures commensurate with those applied to the original design and be approved by the organization performing the original design, unless the applicant designates another responsible organization. Contrary to the above, the licensee made modifications to the design operating pressure of the Unit 1 CCW System Valves HV3096A and HV3096B which isolate CCW flow to and from the non-safety related evaporator packages and hydrogen recombiners. These modifications were made using Calculation SM-99-2189-017, which had been revised with errors in regulator settings for the above valves. The licensee identified the errors in the calculation following changes to regulator settings and entered the error into their CAP. Station personnel performed an operability evaluation of these valves and determined compensatory measures were necessary until their regulator settings could be readjusted to their correct design setpointsadjusted to their correct design setpoints  +
23:59:59, 31 March 2008  +
05000348  +  and 05000364  +
23:59:59, 31 March 2008  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
15:35:15, 30 May 2018  +
23:59:59, 31 March 2008  +
Licensee-Identified Violation  +