Browse wiki

Jump to navigation Jump to search
The inspectors identified an NCV of 10 CFRThe inspectors identified an NCV of 10 CFR 50, Appendix B, Criterion XVl, Corrective Action, because Entergy personnel did not promptly correct an adverse condition related to the safety-related control room ventilation fan. Specifically, between September 1, 2O1O and September 27 ,2011, inspectors identified that Entergy personnel did not promptly implement corrective actions to revise maintenance procedures to include post maintenance belt tensioning after a break-in period which resulted in additional failures of the 21 central control room fan (CCRF) while in service. Entergy staff revised scheduled work orders to perform post-maintenance break-in checks. Entergy personnel entered this issue into the CAP as CR-nel entered this issue into the CAP as CR-  +
23:59:59, 31 December 2011  +
05000247  +
23:59:59, 31 December 2011  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
19:05:28, 30 September 2017  +
23:59:59, 31 December 2011  +
Untimely Conective Actions for Repeated Control Room Fan Failures  +