Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000275/20220042 February 2023Integrated Inspection Report 05000275/2022004 and 05000323/2022004
IR 05000275/202200210 August 2022Integrated Inspection Report 05000275/2022002 and 05000323/2022002
L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation9 March 2022Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation
ML21060B18726 January 2020Enclosure 3 - 1-26-21 Diablo Canyon Renewal pre-app Meeting Slides
IR 05000275/201700210 August 2017NRC Integrated Inspection Report 05000275/2017002 and 05000323/2017002
ML16055A28126 February 2016Relief Request NDE-FWNS-U1/U2 to Allow Use of Alternate Examination Volume Coverage Requirements, Third 10-Year Inservice Inspection Interval
ML15337A0218 December 2015Relief Request NDE-SG-MS-IR - Relief from Exam Requirements for Main Steam Nozzles in Replacement Steam Generators, Third 10-Year Inservice Inspection Interval
ML15261A00718 September 2015Request for Relief PRS-3, Proposed Alternative to Requirements for System Leakage Testing Class 1 Piping Vent, Drain, and Test Isolation Devices, for the Third 10-year Inservice Inspection Interval (TAC MF6520-MF6521)
DCL-15-086, ASME Section XI Inservice Inspection Program Request for Relief PRS-328 July 2015ASME Section XI Inservice Inspection Program Request for Relief PRS-3
ML15187A03515 July 2015Relief Request REP-SI, Revision 2, Proposed Alternative for Repair/Replacement Activities for Certain Safety Injection Pump Welded Attachments, Remaining Useful Life +20 Years
DCL-15-038, Response to NRC Request for Additional Information Regarding Relief Request REP-SI - Part 230 March 2015Response to NRC Request for Additional Information Regarding Relief Request REP-SI - Part 2
ML14202A61421 July 2014ASME Section XI Inservice Inspection Program Request for Alternative REP-SI: Proposed Alternative to Requirements for Repair/Replacement Activities for Certain Safety Injection Pump Welded Attachments
DCL-14-053, Owner'S Activity Report for Eighteenth Refueling Outage11 June 2014Owner'S Activity Report for Eighteenth Refueling Outage
ML14101A2467 April 2014Inservice Inspection Program Relief Request SWOL-REP-1 U2 for Approval of an Alternative to the ASME Code, Section Xl, for Preemptive Full Structural Weld Overlays
ML13192A35412 September 2013Relief Request RVFLNG-INT3 - Alternative to ASME Code Pressure Test Requirements for Class 1 Reactor Vessel Flange Leakoff Lines, Third 10-Year Inservice Inspection Interval (TAC MF0408-MF0409)
ML13232A30828 August 2013Relief Request REP-1 U2, Revision 2, Alternative to Code Requirements for Pressurizer Structural Weld Overlays, for the Third 10-Year Inservice Inspection Interval
DCL-13-063, Inservice Inspection Report for Seventeenth Refueling Outage13 June 2013Inservice Inspection Report for Seventeenth Refueling Outage
DCL-13-046, Response to NRC Request for Additional Information Regarding Request for Approval of an Alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section XI Pressure Test...29 April 2013Response to NRC Request for Additional Information Regarding Request for Approval of an Alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section XI Pressure Test...
ML13078A2975 March 2013Enclosure 1, Inservice Inspection (ISI) Relief Request REP-1 U2, Revision 2 in Accordance with 10 CFR 50.55a(a)(3)(i)
DCL-12-129, Request for Approval of an Alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section XI Pressure Test Requirements for Class 1 Reactor Vessel Flange Leakoff Lines20 December 2012Request for Approval of an Alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section XI Pressure Test Requirements for Class 1 Reactor Vessel Flange Leakoff Lines
DCL-12-117, 2011 Annual Commitment Change Summary Report20 November 20122011 Annual Commitment Change Summary Report
ML12025A30428 December 2011Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Page 201 Through Drawing No. 102028, Sheet 38
DCL-12-006, Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Page 201 Through Drawing No. 102028, Sheet 3828 December 2011Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Page 201 Through Drawing No. 102028, Sheet 38
DCL-11-093, Inservice Inspection Report for Sixteenth Refueling Outage1 September 2011Inservice Inspection Report for Sixteenth Refueling Outage
IR 05000275/201100310 August 2011IR 05000275-11-003, 05000323-11-003; 3/28/2011 6/26/2011; Diablo Canyon Power Plant, Integrated Resident and Regional Report; Fire Protection, Plant Modifications, Identification and Resolution of Problems, and Radiological Hazard Assessmen
IR 05000275/20100057 February 2011IR 05000275-10-005 & 05000323-10-005, on 09/26/2010 - 12/31/2010, Diablo Canyon Power Plant, Integrated Resident and Regional Report; Fire Protection; Operability Evaluations; Plant Modifications, Post Maintenance Testing, and Other Activit
ML11020030519 January 2011IR 05000323-11-003, Diablo Canyon Power Plant, Unit 2- Notification of Inspection (NRC Integrated Inspection and Request for Information
DCL-10-158, CFR 54.21(b) Annual Update to the DCPP License Renewal Application and Amendment No. 3429 December 2010CFR 54.21(b) Annual Update to the DCPP License Renewal Application and Amendment No. 34
ML10364021429 December 201010 CFR 54.21 (B) Annual Update to the DCPP License Renewal Application and License Renewal Application Amendment No. 34
ML10327034923 November 2010Lr - Draft Teleconference Sumary for November 9, 2010
ML1030604732 November 2010Lr - Draft RAI Set 32
ML1024507431 September 2010Notification of Inspection (NRC Integrated Inspection Report 05000275-10-005) and Request for Information
DCL-10-100, Response to NRC Letter Dated July 20, 2010 Request for Additional Information (Set 11) for License Renewal Application17 August 2010Response to NRC Letter Dated July 20, 2010 Request for Additional Information (Set 11) for License Renewal Application
ML10169032111 August 2010Audit Report for Plant Aging Management Programs for DCPP, Units 1 and 2
ML10193005222 July 2010Summary of Telephone Conference Call Held on July 8, 2010 Btw the USNRC and Pacific Gas and Electric Company Concerning D-RAI Related to the Diablo Canyon Nuclear Power Plant, Units 1 and 2, LRA - Scoping and Screening and Aging Management
ML10188025520 July 2010RAI Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Reactor Vessel Internals
ML10253051215 July 2010Lr - Draft Telecon Summaries for 7/1/10 and 7/8/10
ML10285061715 July 2010Lr - Draft Telecon Summaries for 7/1/10 and 7/8/10
DCL-10-073, Response to NRC Request for Additional Information on License Renewal Application7 July 2010Response to NRC Request for Additional Information on License Renewal Application
ML10253052517 June 2010Lr - Draft RAI Set 11 - Reactor Vessel
ML10285064417 June 2010Lr - Draft RAI Set 11 - Reactor Vessel
ML10253052815 June 2010Lr -
ML10285064615 June 2010Lr -
ML10154041914 June 2010Letter Request for Additional Information Related to the Review of the Diablo Canyon Nuclear Power Plant, Units 1 and 2, License Renewal Application (TAC Nos. ME2896 and ME2897) - Aging Management Programs
ML10285066020 May 2010Lr - Draft RAI Set 4 (Correction Email)
ML10273074020 May 2010Lr - Draft RAI Set 4 (Correction Email)
ML09243047331 August 2009Notification of Inspection (NRC Inspection Report 05000323-09-005) and Request for Information
IR 05000275/20090025 May 2009IR 05000275-09-002, 05000323-09-002; 1/1/2009 - 3/31/2009; Diablo Canyon Power Plant, Integrated Resident and Regional Report; Refueling and Other Outage Activities and Access Control to Radiologically Significant Areas
ML0900503315 January 2009Notification of Inspection and Request for Information
ML07345081111 December 2007Notification of Inspection and Request for Information