Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX | 8 January 2024 | Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX |
RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology | 30 August 2023 | License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology |
ML23195A078 | 29 August 2023 | Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 |
RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | 16 February 2023 | Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements |
IR 05000261/2022011 | 19 July 2022 | Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 |
ML18288A139 | 29 April 2019 | Issuance of Amendments 171, 263 Revising Technical Specifications to Support Self Performance of Core Reload Design and Safety Analyses |
ML19115A318 | 25 April 2019 | 302 Retake ADAMS-2B Final Exam Items Normal Release |
ML18172A172 | 15 August 2018 | Issuance of Amendments to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application |
ML17354B267 | 20 December 2017 | 05000261/17301 as Given RO Written Exam with References and Key - Delay Release 2 Yrs |
ML16336A527 | 1 December 2016 | H.B. Robinson, Unit 2, and ISFSI - Transmittal of Emergency Plan and Emergency Implementing Procedures Revisions and 10 CFR 50.54(q) Summary of Analyses |
RNP-RA/16-0071, Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis | 20 September 2016 | Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis |
ML16125A039 | 27 April 2016 | (10) Robinson 2016-301 Final Simulator Scenarios |
RNP-RA/16-0001, Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analysis, Revision 14 to EPCLA-04, Emergency Action Level Technical Bases Document. | 13 January 2016 | Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analysis, Revision 14 to EPCLA-04, Emergency Action Level Technical Bases Document. |
ML15245A586 | 2 September 2015 | Initial Exam 2011-301 Draft Admin Jpm'S |
ML15245A551 | 2 September 2015 | Initial Exam 2011-301 Draft Admin Jpm'S |
RNP-RA/15-0053, Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04) | 19 August 2015 | Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04) |
ML15245A561 | 21 May 2015 | Initial Exam 2011-301 Final Admin Jpm'S |
RNP-RA/15-0034, Proposed Changes to Emergency Plan | 13 May 2015 | Proposed Changes to Emergency Plan |
ML15167A141 | 29 October 2014 | Initial Exam 2014-301 Draft Simulator Scenarios |
ML15167A344 | 29 October 2014 | Initial Exam 2014-301 Draft Simulator Scenarios |
IR 05000261/2014002 | 29 April 2014 | IR 05000261-14-002, Duke Energy Progress, Inc.: 1/01/2014-3/31/2014; H.B. Robinson Steam Electric Plant, Unit 2; Fire Protection, Inservice Inspection Activities, Maintenance Effectiveness, Operability Determinations |
ML13339A665 | 30 November 2013 | Initial Exam 2013-301 Draft SRO Written Exam |
IR 05000261/2013004 | 30 October 2013 | IR 05000261-13-004, on 07/01/2013 - 09/30/2013; H.B. Robinson Steam Electric Plant, Unit 2; Integrated Inspection |
ML120480093 | 10 February 2012 | Initial Exam 2011-302 Final Administrative JPMs |
ML120480078 | 10 February 2012 | Initial Exam 2011-302 Final Administrative Documents |
ML120480074 | 10 February 2012 | Initial Exam 2011-302 Draft Administrative JPMs |
ML120470144 | 10 February 2012 | Initial Exam 2011-302 Draft SRO Written Exam |
IR 05000261/2008002 | 25 April 2008 | IR 05000261-08-002 on 01/01 - 03/31/08 for H.B. Robinson, Unit 2, Maintenance Rick Assessment, Problem Identification & Resolution |
RNP-RA/07-0108, Transmittal of Technical Specifications Bases Revisions | 30 October 2007 | Transmittal of Technical Specifications Bases Revisions |
RNP-RA/06-0105, Response to NRC RAI Pertaining to Proposed Technical Specifications Changes Regarding Steam Generator Tube Integrity | 20 November 2006 | Response to NRC RAI Pertaining to Proposed Technical Specifications Changes Regarding Steam Generator Tube Integrity |
RNP-RA/06-0028, Request for Technical Specifications Change Regarding Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process | 30 May 2006 | Request for Technical Specifications Change Regarding Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process |
RNP-RA/06-0033, Transmittal of Technical Specifications Bases Revisions | 6 April 2006 | Transmittal of Technical Specifications Bases Revisions |
IR 05000261/2004005 | 28 January 2005 | IR 05000261-04-005, IR 07200003-04-002, on 09/12/2004 - 12/31/2004, Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit 2; Emergency Preparedness |
ML042710206 | 24 September 2004 | Technical Specifications, Full Implementation of the Alternative Source Term |
ML040990713 | 19 April 2004 | Technical Specifications |
RNP-RA/03-0139, Submittal of 90-day Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity | 13 November 2003 | Submittal of 90-day Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity |
ML032720357 | 25 September 2003 | Meeting Handout Materials for 09/25/03 Meeting to Discuss CP&L Request for Relaxation from the NRC Order for Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at PWRs |
RNP-RA/03-0001, Response to Request for Additional Information Regarding 60-Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity | 31 January 2003 | Response to Request for Additional Information Regarding 60-Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity |
RNP-RA/02-0072, Submittal of 60-Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. | 17 May 2002 | Submittal of 60-Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. |
RNP-RA/02-0067, Request for Technical Specifications Change, Full Implementation of Alternative Radiological Source Term | 10 May 2002 | Request for Technical Specifications Change, Full Implementation of Alternative Radiological Source Term |