Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML22021B6601 February 2022Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1
ML21347A03813 January 2022Issuance of Amendments to Revise Reactor Coolant Leakage Requirements
ML21277A19316 November 2021Enclosure 2, Draft Conforming License Amendments
ML21278A1077 September 20212 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant and Associated Systems, Table of Contents
ML21278A1137 September 20212 to Updated Final Safety Analysis Report, Chapter 4, Section 4.3, Leak Detection System
ML21278A2977 September 20216 to Technical Specification Bases
RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments25 March 2021Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments
ML20034G54612 March 2020Issuance of Amendments Revising Instrument Testing and Calibration Definitions
ML18262A0966 March 2018Technical Specification Bases, Revisions 62 Through 63
ML17261A22919 July 2017Bases 3.4, Reactor Coolant System(Rcs), Revisions; B 3.4.1-1 Through B 3.4318-8
ML17073A06726 May 2017Issuance of Amendments Revising the Technical Specification Requirements for the Inservice Testing Program (CAC Nos. MF8238 - MF8256)
ML16280A4026 October 2016License Amendment Request - Supplement Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing.
ML16258A0788 September 2016Technical Specification Bases B 3.4.1, RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits
ML16209A21826 July 2016Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing.
ML15257A1994 September 2015Technical Specification Bases, Revisions 49 Through 55. Part 7 of 12
ML14267A22919 September 2014B 3.4.1-1, RCS Pressure, Temperature and Flow DNB Limits Through B 3.4.18-8, SG Tube Integrity
ML14125A0151 May 2014License Amendment Request: Adoption of Technical Specification Task Force Traveler (TSTF) - 425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b
ML13281A39724 September 2013Revision 46 to Technical Specification Bases. Sections B 3.4.1-1 to B 3.4.18-8
IR 05000317/20120046 November 2012IR 05000317-12-004, 05000318-12-004; 7/1/2012-9/30/2012; Calvert Cliffs Nuclear Power Plant (Ccnpp), Units 1 and 2; Maintenance Effectiveness, Operability Determinations and Functionality Assessments
ML12284A2532 October 2012Technical Specification Bases, Revisions 44 and 45, B 3.4, Reactor Coolant System (RCS)
ML11287A1324 October 2011Technical Specification Bases, Revisions 40 Through 43, Section B 3.4 - Reactor Coolant System (RCS)
ML1107003561 February 2011Independent Spent Fuel Storage Installation, ERPIP-600, Severe Accident Management. Part 6 of 13
ML10266056017 September 2010Technical Specification Bases, Revisions 38 & 39, Section B 3.4 - Reactor Coolant System (RCS)
ML09267027415 September 2009Technical Specification Bases, Revisions 36 and 37, B 3.4, Reactor Coolant System (RCS)
ML0826603549 May 2008Technical Specification Bases, Revisions 33 Through 35, Page B 3.4.1-1 Through B 3.4.18-8
IR 05000317/200700729 October 2007EA-07-241, IR 05000317-07-007 and 05000318-07-007, on 08/24/2007 - 09/14/2007, Calvert Cliffs Nuclear Power Plant, Units 1 and 2, Problem Identification and Resolution
ML0728301555 September 2007Technical Specification Bases, B 3.4 Reactor Coolant System, Pages B 3.4.1-1 Through B 3.4.18-8
ML06284017427 September 2006Technical Specifications Bases Unit Nos. 1 & 2. Bases B 3.4 Reactor Coolant System (Rcs), Pages B 3.4.1-1 Through B 3.4.1-2
IR 05000317/200500525 January 2006IR 05000317-05-005, 05000318-05-005; 10/01/2005 - 12/31/2005; Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Equipment Alignment, Maintenance Effectiveness and Cross-Cutting Areas
ML0409702605 March 2004Final - Written (RO & SRO) W/Answer Key
ML20217P31928 January 1998Rev 7 to Ccnpp Emergency Action Levels Technical Basis Document
ML20198K98512 January 1998Rev 11 to Proposed Tech Specs,Reflecting Conversion to Improved Sts,Per NUREG-1432
ML20090C47228 February 1992Proposed Tech Specs to 910328 Application for Amend, Making Editorial Changes
IR 05000317/198701714 August 1987Insp Repts 50-317/87-17 & 50-318/87-19 on 870701-31.No Violations Noted.Major Areas Inspected:Facility Activities, Routine Insps,Operational Events,Nrc Notifications,Maint, Surveillance,Lers,Radiological Controls & Physical Security
IR 05000317/198601118 September 1986Insp Repts 50-317/86-11 & 50-318/86-11 on 860701-0831. Violation Noted:Msiv Accumulator Valve Isolation.Issue Re Exiguous Operator Awareness of Activities within Area of Responsibility Also Noted
IR 05000317/19780266 October 1978IE Inspec Rept 50-317/78-26 & 50-318/78-20 on 780912-15 During Which 1 Item of Noncompliance Was Noted:Failure to Comply W/Limiting Conditions for Oper