Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML12114A0615 April 2012Technical Report, SQN2-SGR-TRI, Revision 3, Sequoyah Unit 2 Steam Generator Replacement Rigging and Heavy Load Handling.
ML11364A03114 December 2011Updated Final Safety Analysis Report Amendment 23
ML11273A16929 September 2011Application to Revise Sequoyah Nuclear Plant, Unit 1, Operating License and Technical Specification 3.7.5, Ultimate Heat Sink, to Support Steam Generator Replacement Project (TS-SQN-2011-05)
ML08325032418 November 2008CFR 50.59, and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report
ML05341023617 November 200510 CFR 50.59, and 10 CFR 72.48 Changes, Tests, & Experiments Summary Report
ML03016024015 January 2003Steam Generator Replacement Project - Topical Report No. 24370-TR-C-002, Rigging and Heavy Load Handling Topical Report, Response to NRC Request for Additional Information
ML03161089924 December 2002Rev 3 to 24370-TR-C-002-A, Sequoyah Unit 1 Steam Generator Replacement Rigging and Heavy Load Handling Topical Report, Table of Contents Through Figure 1
ML02106058115 April 2002Steam Generator Replacement Project - Topical Report No. 24370-TR-C-002, Rigging & Heavy Load Handling.
Information Notice 1996-64, Modifications to Containment Blowout Panels Without Appropriate Design Controls10 December 1996Modifications to Containment Blowout Panels Without Appropriate Design Controls
IR 05000327/198801927 May 1988Insp Repts 50-327/88-19 & 50-328/88-19 on 880306-0404 & 0415.Violations Noted & Inspector Followup Item Identified. Major Areas Inspected:Operational Safety Verification, Review of IE Bulletins & Info Notices
IR 05000327/19880135 May 1988Insp Repts 50-327/88-13 & 50-328/88-13 on 880201-19.All Integrated Design Insp (Idi) Findings Closed But Several Findings Re Licensing Issues Require Licensee Resolve.Major Areas Inspected:Corrective Actions on Idi Findings
IR 05000327/198707427 January 1988Insp Repts 50-327/87-74 & 50-328/87-74 on 871102-10 & 17-19. Deficiencies & Weaknesses Re Technical Adequacy of Structural Calculations for safety-related Bldgs Noted
IR 05000327/198704830 October 1987Insp Repts 50-327/87-48 & 50-328/87-48 on 870708-0911. Deficiencies & Unresolved Items Noted.Major Areas Inspected: Quality of Design Activities,Including Mechanical Sys & Components & Civil/Structural & Electrical Power Designs
ML20236B1489 October 1987Forwards Specific Draft Deficiencies & Unresolved Items Identified by Integrated Design Insp Which Must Be Resolved Prior to Restart,Per 870708 Meeting.Followup Insp Currently Scheduled for 871022 & 23 & Wk of 871102
ML20235P6122 October 1987Forwards Response to Request for Addl Info Re Integrated Design Insp,Including Util Position on 14 of 19 Concerns Raised by Integrated Design Insp.Results of Insp in Civil Area Do Not Bring Into Doubt Overall Structural Adequacy
ML20235U24925 September 1987Rev 2 to TVA Employee Concern Special Program,Sequoyah Nuclear Plant Subcategory Rept SQN-NSRS-2, Review of Nuclear Safety Review Staff Restart Items at Sequoyah
ML20235B14911 September 1987Transcript of 870911 Proceedings Re Findings from Integrated Design Insp at Tva.Pp 1-71
ML20207Q28712 January 1987Rev 1 to Review of Nuclear Safety Review Staff Open Items Requiring Closure or Tracking at Sequoyah, Plant Element Rept
ML20207K54016 December 1986Rev 1 to TVA Employee Concerns Special Program,Sequoyah Nuclear Plant Element:Review of Nuclear Safety Review Staff Open Items Requiring Closure or Tracking at Sequoyah
ML20049J3285 March 1982Forwards Response to Rl Tedesco 811110 Ltr to Hg Parris Re Tornado Missile Protection for 480-volt Transformers. Positive Protection from 1-inch Diameter Missile for Intake & Exhaust Openings Over Transformers Will Be Provided