Issue date | Title | |
---|---|---|
ML12114A061 | 5 April 2012 | Technical Report, SQN2-SGR-TRI, Revision 3, Sequoyah Unit 2 Steam Generator Replacement Rigging and Heavy Load Handling. |
ML11364A031 | 14 December 2011 | Updated Final Safety Analysis Report Amendment 23 |
ML11273A169 | 29 September 2011 | Application to Revise Sequoyah Nuclear Plant, Unit 1, Operating License and Technical Specification 3.7.5, Ultimate Heat Sink, to Support Steam Generator Replacement Project (TS-SQN-2011-05) |
ML083250324 | 18 November 2008 | CFR 50.59, and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report |
ML053410236 | 17 November 2005 | 10 CFR 50.59, and 10 CFR 72.48 Changes, Tests, & Experiments Summary Report |
ML030160240 | 15 January 2003 | Steam Generator Replacement Project - Topical Report No. 24370-TR-C-002, Rigging and Heavy Load Handling Topical Report, Response to NRC Request for Additional Information |
ML031610899 | 24 December 2002 | Rev 3 to 24370-TR-C-002-A, Sequoyah Unit 1 Steam Generator Replacement Rigging and Heavy Load Handling Topical Report, Table of Contents Through Figure 1 |
ML021060581 | 15 April 2002 | Steam Generator Replacement Project - Topical Report No. 24370-TR-C-002, Rigging & Heavy Load Handling. |
Information Notice 1996-64, Modifications to Containment Blowout Panels Without Appropriate Design Controls | 10 December 1996 | Modifications to Containment Blowout Panels Without Appropriate Design Controls |
IR 05000327/1988019 | 27 May 1988 | Insp Repts 50-327/88-19 & 50-328/88-19 on 880306-0404 & 0415.Violations Noted & Inspector Followup Item Identified. Major Areas Inspected:Operational Safety Verification, Review of IE Bulletins & Info Notices |
IR 05000327/1988013 | 5 May 1988 | Insp Repts 50-327/88-13 & 50-328/88-13 on 880201-19.All Integrated Design Insp (Idi) Findings Closed But Several Findings Re Licensing Issues Require Licensee Resolve.Major Areas Inspected:Corrective Actions on Idi Findings |
IR 05000327/1987074 | 27 January 1988 | Insp Repts 50-327/87-74 & 50-328/87-74 on 871102-10 & 17-19. Deficiencies & Weaknesses Re Technical Adequacy of Structural Calculations for safety-related Bldgs Noted |
IR 05000327/1987048 | 30 October 1987 | Insp Repts 50-327/87-48 & 50-328/87-48 on 870708-0911. Deficiencies & Unresolved Items Noted.Major Areas Inspected: Quality of Design Activities,Including Mechanical Sys & Components & Civil/Structural & Electrical Power Designs |
ML20236B148 | 9 October 1987 | Forwards Specific Draft Deficiencies & Unresolved Items Identified by Integrated Design Insp Which Must Be Resolved Prior to Restart,Per 870708 Meeting.Followup Insp Currently Scheduled for 871022 & 23 & Wk of 871102 |
ML20235P612 | 2 October 1987 | Forwards Response to Request for Addl Info Re Integrated Design Insp,Including Util Position on 14 of 19 Concerns Raised by Integrated Design Insp.Results of Insp in Civil Area Do Not Bring Into Doubt Overall Structural Adequacy |
ML20235U249 | 25 September 1987 | Rev 2 to TVA Employee Concern Special Program,Sequoyah Nuclear Plant Subcategory Rept SQN-NSRS-2, Review of Nuclear Safety Review Staff Restart Items at Sequoyah |
ML20235B149 | 11 September 1987 | Transcript of 870911 Proceedings Re Findings from Integrated Design Insp at Tva.Pp 1-71 |
ML20207Q287 | 12 January 1987 | Rev 1 to Review of Nuclear Safety Review Staff Open Items Requiring Closure or Tracking at Sequoyah, Plant Element Rept |
ML20207K540 | 16 December 1986 | Rev 1 to TVA Employee Concerns Special Program,Sequoyah Nuclear Plant Element:Review of Nuclear Safety Review Staff Open Items Requiring Closure or Tracking at Sequoyah |
ML20049J328 | 5 March 1982 | Forwards Response to Rl Tedesco 811110 Ltr to Hg Parris Re Tornado Missile Protection for 480-volt Transformers. Positive Protection from 1-inch Diameter Missile for Intake & Exhaust Openings Over Transformers Will Be Provided |