Issue date | Title | |
---|---|---|
ML22131A095 | 5 May 2022 | 1 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML20323A125 | 22 October 2020 | Rev. 20 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
IR 05000443/2019010 | 3 July 2019 | Design Bases Assurance Inspection Report 05000443/2019010 |
ML17310A416 | 27 October 2017 | Seabrook Station Revision 18 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
IR 05000443/2016007 | 14 December 2016 | Component Design Bases Inspection Report 05000443/2016007 |
ML16218A455 | 5 August 2016 | Integrated Inspection Report 05000443/2016002 |
ML15278A200 | 28 October 2015 | Report for the Onsite Audit Regarding Implementation of Mitgating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 (TAC Nos. MF0836 and MF0837) |
ML14317A633 | 21 October 2014 | Seabrook Station Updated Final Safety Analysis Report, Revision 16, Chapter 9, Auxiliary Systems |
ML14171A405 | 17 June 2014 | Comment (6) of James M. Petro, on Behalf of Florida Power & Light Company, on Draft Regulatory Issue Summary 2014-XX, Tornado Missile Protection. |
ML13134A085 | 26 April 2013 | Updated Final Safety Analysis Report, Revision 15, Chapter 9 - Auxiliary Systems |
ML12102A245 | 23 January 2012 | E-mail from H. Cruz, NRR to M. Murphy, NRR; Subject: Comment on Seabrook TIA Consolidated for Region I TIA Status Report |
ML12102A244 | 17 January 2012 | E-mail from R. Conte, Region I to H. Cruz, NRR; Subject: Comments on Seabrook TIA Consolidated for Region 1 TIA Status Report |
ML12174A086 | 13 January 2012 | E-mail from R. Conte, Region I to H. Cruz, NRR, Et Al; Subject: Comments on Seabrook TIA Consolidated for Region I TIA Status Report |
ML12088A219 | 15 December 2011 | E-mail from Holly Cruz, NRR to Robert Nelson, NRR, Et Al; Subject: Tia Status Report |
ML091330438 | 3 November 2008 | Seabrook - Updated Final Safety Analysis Report, Revision 12, Chapter 9, Auxiliary Systems |
ML032591145 | 9 September 2003 | Response to Request for Additional Information Regarding License Amendment Requests 02-06 and 02-07 |
Information Notice 1996-64, Modifications to Containment Blowout Panels Without Appropriate Design Controls | 10 December 1996 | Modifications to Containment Blowout Panels Without Appropriate Design Controls |
ML20115H763 | 23 October 1992 | Forwards Response to NRC Concern,Delineated in Re Design of Tornado Barriers & Plant Doors.Results of Review Contained in Encl Confirmed That Plant Design Capable of Withstanding DBT as Defined in Updated FSAR |
ML20011D438 | 19 December 1989 | LER 89-011-01:on 890905,three Unsealed Piping Penetrations in Condensate Storage Tank Encl Identified.Caused by Failure to Transfer Sealing Requirements Into Detail Drawings.Penetrations sealed.W/891219 Ltr |
ML20133H900 | 31 July 1985 | Safety Evaluation Report Related to the Operation of Seabrook Station,Units 1 and 2.Docket Nos. 50-443 and 50-444.(Public Service Company of New Hampshire,Et Al) |
ML20070R962 | 1 February 1983 | Forwards Responses to Power Sys Branch Open Items Discussed at 830110-12 & 15 Meetings.Responses Will Be Included in Amend 49 to OL Application |
ML20066G720 | 12 November 1982 | Forwards Revised Responses to Power Sys Branch 820212 Series 430 Requests for Addl Info.Responses Will Be Included in OL Application,Amend 48 |
ML20027E507 | 9 November 1982 | Forwards Revision to FSAR Sections 6.4.2.2 & 9.4.1.2, Incorporating Tornado Missile Protection for Control Room Air Intakes.Revisions Will Be Included in OL Application Amend 48 |
ML20050D564 | 8 April 1982 | Forwards Notes from Structural Engineering Branch Design Audit Conducted 820329-0402 |