Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML21099A11431 March 2021Summary of Facility Changes, Tests and Experiments
ML21035A3034 February 2021(Naps), Units 1 and 2 - Update to Subsequent License Renewal Application (SLRA) Supplement 1
ML20309A59330 September 20206 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML20309A59430 September 20206 to Updated Final Safety Analysis Report, Frontmatter
ML20309A61330 September 20206 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control
ML20309A61230 September 20206 to Updated Final Safety Analysis Report, Chapter 8, Electric Power System
ML20309A60830 September 20206 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features
ML19156A20724 May 2019Response to Request for Additional Information on Proposed License Amendment Request Open Phase Protection Per NRC Bulletin 2012-01
ML20311A5016 November 20172017 Q1-Q4 ROP Inspection Findings
ML20311A4936 November 20172017 Q1-Q4 ROP Inspection Findings
ML17033B54029 September 2016Redacted Updated Final Safety Analysis Report Chapter 9
ML17033B50029 September 2016North Anna Power Station, Units 1 and 2 - Redacted Updated Final Safety Analysis Report Chapter 3
ML17033B52529 September 2016Redacted Updated Final Safety Analysis Report Chapter 6
ML17033B53329 September 2016Redacted Updated Final Safety Analysis Report Chapter 8
ML17033B53129 September 2016Redacted Updated Final Safety Analysis Report Chapter 7
IR 05000338/201600227 July 2016NRC Integrated Inspection Report 05000338/2016002 and 05000339/2016002, April 1, 2016 Through June 30, 2016
IR 05000338/20150018 May 2015IR 05000338/2015-001, 05000339/2015-001; 01/01/2015 - 03/31/2015; North Anna Power Station, Units 1 and 2. Maintenance Effectiveness
IR 05000338/20120045 November 2012IR 05000338-12-004, 05000339-12-004 North Anna Power Station, Units 1 and 2, Routine Integrated Inspection Report. Adverse Weather Protection, Identification and Resolution of Problems
ML09282015530 September 2009Updated Final Safety Analysis Report, Revision 45, Chapter 6, Engineered Safety Features
ML09282015630 September 2009Updated Final Safety Analysis Report, Revision 45, Chapter 7, Instrumentation and Control
ML09282015730 September 2009Updated Final Safety Analysis Report, Revision 45, Chapter 8, Electric Power System
ML09282015830 September 2009Updated Final Safety Analysis Report, Revision 45, Chapter 9, Auxiliary Systems
IR 05000338/200900327 July 2009Integrated IR 05000338-09-003 & 05000339-09-003 on 04/01/09 - 06/30/09 for North Anna, Units 1 & 2
IR 05000338/200800528 January 2009IR 05000338-08-005, 05000339-08-005, on 10/01/2008 - 12/31/2008, North Anna Power Station, Units 1 and 2; Routine Integrated Report, Fire Protection
IR 05000338/200600430 October 2006IR 05000338-06-004, IR 05000339-06-004, on 07/01/2006 - 09/30/2006 for North Anna, Units 1 and 2, Adverse Weather Protection
IR 05000338/200400323 July 2004IR 05000338-04-003, 05000339-04-003, on 03/28/04 - 06/26/04, North Anna, Units 1 & 2; Integrated Resident & Regional Report; Maintenance Implementation, Maintenance Risk Assessment, Non-Routine Evolution, Operability Evaluation & Surveillan
Information Notice 1996-64, Modifications to Containment Blowout Panels Without Appropriate Design Controls10 December 1996Modifications to Containment Blowout Panels Without Appropriate Design Controls
ML20101C71831 December 1995Summary of Facility Changes,Tests & Experiments During 1995
ML18151A93510 February 1992Responds to Request for Addl Info on SBO Sers.Util Reviewing Project Schedule for Implementation of Station Blackout Mods & Will Advise NRC of Results by 920316.Justification for Five Year Schedule Encl
ML20043H83222 June 1990LER 90-007-00:on 900523,discovered That Two Sets of Concrete Roof Blocks on Svc Water Pump House Not in Required Safety Position.Caused by Lack of Administrative Controls.Blocks Restored to Required locations.W/900622 Ltr
ML20206D49013 June 1986Requests Relief from Hydrostatic Test Requirements of ANSI B31.1 for Spray & Bypass Piping Sys Downstream of Spray & Bypass Isolation Valves in Light of Ongoing Program to Upgrade Svc Water Sys.Design Summary Rept Encl.Fee Paid
ML19225A0831 June 1979Interrogatories & Document Requests for NRC Submitted by Potomac Alliance.Requests Info on Spent Fuel Pool Re Alternatives,Tornado Damage,Turbine Missile Damage,Defective Fuel Rods & Changes in NRC Requirements
ML19224C81430 May 1979Responses to NRC Interrogatories & Document Requests.Answers Contentions 3,4,6 & 7,re Missile Accidents,Matl Integrity, Occupational Exposure & Alternatives.Certificate of Svc Encl
ML19224D38511 May 1979Motion by Util for Summary Disposition of All Matters in Proceeding.No Genuine Issues to Be Heard on Any Contention Raised by Potomac Alliance & Citizens Energy Forum.Affidavit of M Brehmer & Certificate of Svc Encl