Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML21099A114 | 31 March 2021 | Summary of Facility Changes, Tests and Experiments |
ML21035A303 | 4 February 2021 | (Naps), Units 1 and 2 - Update to Subsequent License Renewal Application (SLRA) Supplement 1 |
ML20309A593 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML20309A594 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Frontmatter |
ML20309A613 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control |
ML20309A612 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 8, Electric Power System |
ML20309A608 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features |
ML19156A207 | 24 May 2019 | Response to Request for Additional Information on Proposed License Amendment Request Open Phase Protection Per NRC Bulletin 2012-01 |
ML20311A501 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
ML20311A493 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
ML17033B540 | 29 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 9 |
ML17033B500 | 29 September 2016 | North Anna Power Station, Units 1 and 2 - Redacted Updated Final Safety Analysis Report Chapter 3 |
ML17033B525 | 29 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 6 |
ML17033B533 | 29 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 8 |
ML17033B531 | 29 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 7 |
IR 05000338/2016002 | 27 July 2016 | NRC Integrated Inspection Report 05000338/2016002 and 05000339/2016002, April 1, 2016 Through June 30, 2016 |
IR 05000338/2015001 | 8 May 2015 | IR 05000338/2015-001, 05000339/2015-001; 01/01/2015 - 03/31/2015; North Anna Power Station, Units 1 and 2. Maintenance Effectiveness |
IR 05000338/2012004 | 5 November 2012 | IR 05000338-12-004, 05000339-12-004 North Anna Power Station, Units 1 and 2, Routine Integrated Inspection Report. Adverse Weather Protection, Identification and Resolution of Problems |
ML092820155 | 30 September 2009 | Updated Final Safety Analysis Report, Revision 45, Chapter 6, Engineered Safety Features |
ML092820156 | 30 September 2009 | Updated Final Safety Analysis Report, Revision 45, Chapter 7, Instrumentation and Control |
ML092820157 | 30 September 2009 | Updated Final Safety Analysis Report, Revision 45, Chapter 8, Electric Power System |
ML092820158 | 30 September 2009 | Updated Final Safety Analysis Report, Revision 45, Chapter 9, Auxiliary Systems |
IR 05000338/2009003 | 27 July 2009 | Integrated IR 05000338-09-003 & 05000339-09-003 on 04/01/09 - 06/30/09 for North Anna, Units 1 & 2 |
IR 05000338/2008005 | 28 January 2009 | IR 05000338-08-005, 05000339-08-005, on 10/01/2008 - 12/31/2008, North Anna Power Station, Units 1 and 2; Routine Integrated Report, Fire Protection |
IR 05000338/2006004 | 30 October 2006 | IR 05000338-06-004, IR 05000339-06-004, on 07/01/2006 - 09/30/2006 for North Anna, Units 1 and 2, Adverse Weather Protection |
IR 05000338/2004003 | 23 July 2004 | IR 05000338-04-003, 05000339-04-003, on 03/28/04 - 06/26/04, North Anna, Units 1 & 2; Integrated Resident & Regional Report; Maintenance Implementation, Maintenance Risk Assessment, Non-Routine Evolution, Operability Evaluation & Surveillan |
Information Notice 1996-64, Modifications to Containment Blowout Panels Without Appropriate Design Controls | 10 December 1996 | Modifications to Containment Blowout Panels Without Appropriate Design Controls |
ML20101C718 | 31 December 1995 | Summary of Facility Changes,Tests & Experiments During 1995 |
ML18151A935 | 10 February 1992 | Responds to Request for Addl Info on SBO Sers.Util Reviewing Project Schedule for Implementation of Station Blackout Mods & Will Advise NRC of Results by 920316.Justification for Five Year Schedule Encl |
ML20043H832 | 22 June 1990 | LER 90-007-00:on 900523,discovered That Two Sets of Concrete Roof Blocks on Svc Water Pump House Not in Required Safety Position.Caused by Lack of Administrative Controls.Blocks Restored to Required locations.W/900622 Ltr |
ML20206D490 | 13 June 1986 | Requests Relief from Hydrostatic Test Requirements of ANSI B31.1 for Spray & Bypass Piping Sys Downstream of Spray & Bypass Isolation Valves in Light of Ongoing Program to Upgrade Svc Water Sys.Design Summary Rept Encl.Fee Paid |
ML19225A083 | 1 June 1979 | Interrogatories & Document Requests for NRC Submitted by Potomac Alliance.Requests Info on Spent Fuel Pool Re Alternatives,Tornado Damage,Turbine Missile Damage,Defective Fuel Rods & Changes in NRC Requirements |
ML19224C814 | 30 May 1979 | Responses to NRC Interrogatories & Document Requests.Answers Contentions 3,4,6 & 7,re Missile Accidents,Matl Integrity, Occupational Exposure & Alternatives.Certificate of Svc Encl |
ML19224D385 | 11 May 1979 | Motion by Util for Summary Disposition of All Matters in Proceeding.No Genuine Issues to Be Heard on Any Contention Raised by Potomac Alliance & Citizens Energy Forum.Affidavit of M Brehmer & Certificate of Svc Encl |