Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
RA-21-0188, Submittal of Updated Final Safety Analysis Report (Revision 22), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, and 10 CFR 50.59 Evaluation Summary Report | 28 October 2021 | Submittal of Updated Final Safety Analysis Report (Revision 22), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, and 10 CFR 50.59 Evaluation Summary Report |
ML20106E907 | 2 April 2020 | 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A, Tables |
ML20106E908 | 2 April 2020 | 1 to Updated Final Safety Analysis Report, Chapter 3, Design Criteria - Structures, Components, Equipment and Systems |
ML20311A623 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
ML20311A627 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
IR 05000413/2014002 | 1 May 2014 | IR 05000413-14-002, 05000414-14-002; on 1/1/2014 - 3/31/2014; Catawba Nuclear Station, Units 1 and 2; Integrated Inspection Report |
IR 05000413/2012007 | 18 October 2012 | IR 05000413-12-007 and 05000414/2012-007; 08/13/2012 - 09/14/2012; Catawba Nuclear Station, Units 1 and 2; Component Design Bases Inspection |
IR 05000413/2009005 | 28 January 2010 | IR 05000413-09-005, 05000414-09-005; 10/1/2009 - 12/31/2009; Catawba Nuclear Station, Units 1 and 2; Mitigating Systems |
ML090640440 | 28 January 2009 | Enclosure 6: Case Study 2: Catawba Emergency TS Change - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf |
IR 05000413/2008006 | 16 January 2009 | IR 05000413-08-006 & 05000414-08-006 on 12/19/08 for Catawba |
ML081980198 | 14 July 2008 | Proposed Technical Specification Amendment, Technical Specification 3.6.6, Containment Spray System; 3.7.5, Auxiliary Feedwater System |
ML050970285 | 31 March 2005 | 2004 10 CFR 50.59 Report |
IR 05000413/2004004 | 15 July 2004 | IR 05000413-04-004, IR 05000414-04-004, on 03/28/2004 - 06/19/2004; Catawba Nuclear Station, Units 1 and 2; Problem Identification and Resolution, Other Activities |
ML20217N297 | 31 December 1997 | CFR50.59 Rept, Containing Brief Description of Changes,Tests & Experiments, Including Summary of SEs |
ML20137N017 | 31 March 1997 | Forwards Summary Which Includes Brief Description of Changes,Tests & Experiments Completed Under Provisions of 10CFR50.59 for 1996 |
Information Notice 1996-64, Modifications to Containment Blowout Panels Without Appropriate Design Controls | 10 December 1996 | Modifications to Containment Blowout Panels Without Appropriate Design Controls |
ML20128R095 | 7 October 1996 | Insp Repts 50-413/96-13 & 50-414/96-13 on 960728-0907. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status |
ML20065C448 | 1 April 1994 | Forwards Summary of All Changes,Tests & Experiments Which Were Completed Under Provisions of 10CFR50.59 from 921001- 930930 |
ML20066B682 | 2 November 1982 | Forwards Summary of 821013 Meeting W/Nrc in Bethesda,Md Re Open Items in Power Sys Branch Review of Fsar.Items Include Tornado Missile Protection for Fuel Oil Storage & Transfer Sys & Fuel Oil Tank Internal Corrosion Protection |
ML20148R427 | 16 November 1978 | Lists Staff Review Categories 2,3 & 4 for Consideration in Preparation of FSAR & Lic Review.W/Encl Descriptions of Categories 2,3 & 4 |