Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23062A62329 December 2022Revision OL-26 to Final Safety Analysis Report, Index to NRC Questions and Responses
ML23067A17429 December 2022Rev. 18 to Technical Specifications, Bases Change, Chapter 3.7, Plant Systems
ML23067A13329 December 2022Site Addendum, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML23067A13229 December 2022Site Addendum, Chapter 9, Auxiliary Systems
ML23062A65129 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 16, Technical Requirements
ML23062A64529 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features
ML23062A64429 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML23062A64229 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML22307A3123 November 2022Evaluation of the Proposed Change
IR 05000483/20210025 August 2021Integrated Inspection Report 05000483/2021002 and Independent Spent Fuel Storage Installation Report 07201045/2021001
ULNRC-06673, Site Addendum, Chapter 3, Design of Structures, Components, Equipment and System22 June 2021Site Addendum, Chapter 3, Design of Structures, Components, Equipment and System
ML21193A19022 June 2021Revision OL-25 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features
ML21193A20322 June 2021Revision OL-25 to Final Safety Analysis Report, Chapter 16, Technical Requirements
ML21193A20722 June 2021Revision OL-25 to Final Safety Analysis Report, Index to NRC Questions and Responses
ML21194A30822 June 2021Site Addendum, Chapter 9, Auxiliary Systems
ML21194A30922 June 2021Site Addendum, Chapter 3, Design of Structures Components Equipment and Systems
ML21173A34122 June 2021CFR 50.59 and 10 CFR 72.48 Summary Report - May 16, 2019 to June 15, 2021
ML20209A08413 November 2019Site Analysis, Chapter 3.0, Design of Structures, Components, Equipment and Systems
ML20209A08113 November 2019Safety Analysis, Chapter 9, Auxiliary Systems
ML20209A04213 November 2019Rev. OL-24 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features
ML20209A03413 November 2019Rev. OL-24 to Final Safety Analysis Report, Index to NRC Questions and Responses
ML20209A03013 November 2019Rev. OL-24 to Final Safety Analysis Report, Chapter 16, Technical Requirements
ML18208A16219 June 2018Revised Site Addendum Item - Chapter 3.0, Design of Structures, Components, Equipment and Systems
ML18208A16719 June 2018Revised Site Addendum Item - Chapter 9.0, Auxiliary Systems
ML18106A7053 May 2018Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to RIS 2015-06, Tornado Missile Protection:
ULNRC-06414, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado ...23 March 2018Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado ...
IR 05000483/201700428 January 2018NRC Integrated Inspection Report 05000483/2017004 and Exercise of Enforcement Discretion
IR 05000483/201700331 October 2017NRC Integrated Inspection Report 05000483/2017003 and Exercise of Enforcement Discretion
05000483/LER-2017-00213 October 2017Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design
LER 17-002-00 for Callaway Plant, Unit 1, Regarding Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design
IR 05000483/201700126 April 2017NRC Integrated Inspection Report 05000483/2017001, Independent Spent Fuel Storage Installation Inspection Report 07201045/2017001, and Exercise of Enforcement Discretion
ML17090A16530 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 16, Technical Specifications
IR 05000483/20140086 November 2014IR 05000483/2014008; on 08/11/2014 - 09/23/2014; Callaway Plant; Problem Identification and Resolution (Biennial)
ULNRC-05494, Application for Amendment to Facility Operating License NPF-30 OL1283 - Revision of Technical Specifications 3.3, 3.7, and 3.83 June 2008Application for Amendment to Facility Operating License NPF-30 OL1283 - Revision of Technical Specifications 3.3, 3.7, and 3.8
ML03337006225 November 2003Revision 016 to EIP-ZZ-00231, Response to Severe Thunderstorm/High Winds/Tornado Watches and Warnings
ML02302030922 October 2002Emergency Plan Implementing Procedure EIP-ZZ-00231 Rev. 015, Response to Severe Thunderstom/High Winds/Tornado Watches & Warnings
ML02294016314 October 2002Emergency Plan Implementing Procedure EIP-ZZ-00231, Revision 014
ML0216804087 June 2002Emergency Plan Implementing Procedure - Revision 13 to EIP-ZZ-00231, Response to Severe Thunderstorm/High Winds/Tornado Watches & Warning.
ML02140061510 May 2002Revision 012 to EIP-ZZ-00231, Response to Severe Thunderstorm/High Winds/Tornado Watches and Warnings.
Information Notice 1996-64, Modifications to Containment Blowout Panels Without Appropriate Design Controls10 December 1996Modifications to Containment Blowout Panels Without Appropriate Design Controls
ML20010G15711 September 1981Forwards marked-up Addl Info Needed for Completion of NRC Review of Turbine Missile Analysis,In Response to NRC Request.Info Will Be Incorporated Into Snupps FSAR Revision & Into Site Addenda