Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML22312A550 | 7 November 2022 | Proposed License Amendment Request to Revise Emergency Plan Staff Augmentation Times |
IR 05000280/2022003 | 7 November 2022 | Integrated Inspection Report 05000280/2022003 and 05000281/2022003, Operation of an Independent Spent Fuel Storage Installation Report 07200055/2022001, and Exercise of Enforcement Discretion |
ML20332A159 | 7 December 2020 | Documentation of Completion of Required Actions Taken in Response to Lessons Learned from the Fukushima Dai-Ichi Accident |
IR 05000280/2020002 | 10 August 2020 | Integrated Inspection Report 05000280/2020002 and 05000281/2020002 and Exercise of Enforcement Discretion |
IR 05000280/2018007 | 29 November 2017 | (Unit 1 and Unit 2) - Notification of a Triennial Fire Protection Baseline Inspection, U.S. Nuclear Regulatory Commission Inspection Report Nos. 05000280/2018007 and 05000281/2018007 |
ML16005A143 | 29 December 2015 | Commitment to Maintain Severe Accident Management Guidelines |
ML14364A403 | 30 December 2014 | Unit 2, Notification of a Triennial Fire Protection Baseline Inspection, U.S. Nuclear Regulatory Commission Inspection Report Nos. 0000280/2015008 and 05000281/2015008 |
ML13240A242 | 31 August 2013 | NUREG/CR-7110 Vol 2 Rev 1 State-of-the-Art Reactor Consequence Analyses Project Volume 2: Surry Integrated Analysis |
ML13031A501 | 31 January 2013 | NUREG/CR-7154 Vol. 2 Risk Informing Emergency Preparedness Oversight: Evaluation of Emergency Action Levels - a Pilot Study of Peach Bottom, Surry and Sequoyah (Appendices C - F) |
ML13031A500 | 31 January 2013 | NUREG/CR-7154 Vol 1 Risk Informing Emergency Preparedness Oversight: Evaluation of Emergency Action Levels - a Pilot Study of Peach Bottom, Surry and Sequoyah (Main Report, Appendices a and B) |
IR 05000280/2012005 | 30 January 2013 | IR 05000280-12-005, 05000281-12-005; 10/01/2012-12/31/2012; Surry Power Station, Units 1 and 2; Flood Protection Measures |
ML12304A008 | 26 October 2012 | Initial Exam 2012-301 Draft Administrative Documents |
ML12304A012 | 13 August 2012 | Initial Exam 2012-301 Final Administrative Documents |
ML121450437 | 23 May 2012 | Notification of Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000280-12-011 and 05000281-12-011) |
ML120260681 | 31 January 2012 | NUREG/CR-7110 Vol 2 State-of-the-Art Reactor Consequence Analyses Project: Surry Integrated Analysis |
ML12024A078 | 28 December 2011 | State-of-the-Art Reactor Consequence Analysis (Soarca); Exclusive Summary for the Full NUREG for Peach Bottom and Surry |
ML12024A365 | 8 December 2011 | Communication Plan for the State-of-the-Art Reactor Consequence Analyses (Draft - Revision 3) |
IR 05000280/2011006 | 1 September 2011 | Mid-Cycle Letter for Surry Power Station Units 1 and 2 - NRC Assessment Report 05000280, 281/2011006 |
IR 05000280/2011003 | 28 July 2011 | IR 05000280-11-003, 05000281-11-003, 07200055-11-001; on 04/01/2011-06/30/2011; Surry Power Station; NRC Integrated Inspection Report |
ML111530328 | 2 June 2011 | Completion of Temporary Instruction (Ti) 184, Availability and Readiness Inspection of Severe Accident Mitigation Guidelines (Samgs) at Region II Facilities - Revision |
IR 05000280/2011013 | 13 May 2011 | NRC Temporary Instruction 2515/183 Inspection Report 050000280/2011013 and 050000281/2011013 |
ML12125A388 | 6 May 2010 | Soarca Project Appendix B Surry Integrated Analysis, W/Handwritten Notes |
ML12124A296 | 25 February 2010 | Soarca Peer Review Comments |
ML12124A294 | 4 January 2010 | Communication Plan for the State-of-the-Art Reactor Consequence Analyses (Revision 4) |
ML12124A293 | 31 December 2009 | Communication Plan for the State-of-the-Art Reactor Consequence Analyses (Revision 3) |
ML11228A226 | 25 March 2009 | Policy Issue for the Commissioners from Brian W. Sheron, RES; Subject: State-of-the-Art Reactor Consequence Analyses - Peach Bottom and Surry Results |
ML11228A233 | 25 March 2009 | Secy Paper/SECY-09-0045:; for the Commissioners, from B. Sheron, RES; Subject: Plan for Developing State-of-the-Art Reactor Consequence Analyses |
ML072120442 | 2 August 2007 | Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 |
ML060590273 | 12 September 2006 | Letter, Response to TIA 2004-04, Acceptance of Proceduralized Departures from Tss. (TAC Mc 4331 and TAC MC4332) |
ML052870379 | 20 October 2005 | Ltr., Re Option 2 Response to Bulletin 2003-01 on PWRs Emergency Sump Recirculation Potential Debris Blockage |
ML052520245 | 22 September 2005 | Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-water Reactors |
ML032480677 | 25 August 2003 | Comment (23) Submitted by Dominion Resources Services Inc., Chris L. Funderburk on Proposed Rules PR-50, Re Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors |
ML18151A723 | 7 August 1997 | Rev 1 to Nuclear Safety Analysis Manual Part Iv,Chapter a Probabilistic Safety Assessment Products. |