Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML20148C61516 May 1997Responds to Recipient Concerns Expressed in Senator SM Collins to Chairman Jackson Re Safety of Plant & Adequacy of NRC Oversight of Facility.Forwards Encl Documents Currently Available from AEOD
ML20132B4535 December 1996Responds to 960904,13,25 & 1007 & 14 Ltrs Re Concerns at Plant About Conformance W/Tmi Action Plan Items II.K.3.30 & II.K.3.31,competence & Integrity Questions About Nonconformance W/Items
ML0631106277 October 1996Independent Safety Assessment of Maine Yankee Atomic Power Company
ML20237F01623 December 1987Rev 1 to MYC-430, Maine Yankee Auxiliary Power Sys Voltage Study
IR 05000309/19870124 August 1987Insp Rept 50-309/87-12 on 870601-05.Violations Noted.Major Areas Inspected:Electric Power Sys Including,Design Features of Electric Power Sys,Verification of as-built Drawings & Review of Load Studies & Analyses
ML20213E8807 November 1986Forwards Summary of Dec 1982 Low Voltage Incident & Description of Corrective Actions,Per 860805 Request.Results of Evaluation of Data to Assess Offsite Power Supply Load Changes Will Be Made Available
ML20202H2473 April 1986Safety Evaluation Supporting Abnormal Operating Procedure AOP 2-12,Rev 1 & Test Procedures 3.1.14A & B,Rev 15 Re Degraded Grid Voltage Procedure
IR 05000309/198502014 November 1985Insp Rept 50-309/85-20 on 850819-1004.No Violation Noted. Major Areas Inspected:Control Room,Accessible Parts of Plant Structures,Plant Operations,Radiation Protection,Physical Security & Fire Protection
ML20126H03726 March 1981Safety Evaluation Re Adequacy of Station Electric Distribution Sys Voltage