Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
IR 05000254/2023010 | 20 December 2023 | Comprehensive Engineering Team Inspection Report 05000254/2023010 and 05000265/2023010 |
RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 8 June 2023 | License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b |
RS-23-007, Application to Adopt TSTF-564, Safety Limit MCPR | 3 March 2023 | Application to Adopt TSTF-564, Safety Limit MCPR |
SVP-22-072, Manual Scram Due to Feedwater Regulator Valve Failure Increasing Reactor Water Level | 30 December 2022 | Manual Scram Due to Feedwater Regulator Valve Failure Increasing Reactor Water Level |
IR 05000254/2022013 | 17 November 2022 | Biennial Problem Identification and Resolution Inspection Report 05000254/2022013 and 05000265/2022013 |
RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration | 3 October 2022 | Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration |
ML21300A255 | 21 October 2021 | 6 to Updated Final Safety Analysis Report, Chapter 05 - Reactor Coolant System and Connected Systems |
ML21300A260 | 21 October 2021 | 6 to Updated Final Safety Analysis Report, Chapter 15 - Accident and Transient Analyses |
ML21300A270 | 21 October 2021 | 6 to Updated Final Safety Analysis Report, Chapter 10 - Steam and Power Conversion System |
RS-21-107, 5 to Technical Requirements Manual | 21 October 2021 | 5 to Technical Requirements Manual |
ML22041A844 | 21 October 2021 | 6 to Updated Final Safety Analysis Report, Chapter 06 - Engineered Safety Features-Redacted |
ML22042B310 | 21 October 2021 | 4 to Fire Protection Report - Volume 2_Redacted |
JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 27 September 2021 | Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position |
RS-20-115, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | 18 November 2020 | Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements |
ML20114E200 | 12 May 2020 | Final ASP Analysis - Quad Cities 2 (LER 265-01-001-01) |
ML20015A436 | 15 January 2020 | Revision 24 to Fire Protection Report, Volume 2 - Redacted |
ML20015A429 | 15 January 2020 | UFSAR Revision 15 Chapter 6 Engineered Safety Features - Redacted |
ML19301A339 | 4 December 2019 | Issuance of Amendments to Revise Technical Specification 2.1.1, Reactor Core Safety Limits, the Minimum Critical Power Ration Safety Limits |
ML19239A035 | 23 August 2019 | NRC-2019-000303 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed |
ML18353A229 | 28 January 2019 | Issuance of Amendment Nos. 273 and 268 Regarding Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control |
RS-18-134, Request to Revise Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits | 5 December 2018 | Request to Revise Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits |
RS-18-006, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. | 26 February 2018 | Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. |
RS-17-170, Company Emergency Plan Annex and Addendum Revisions | 19 December 2017 | Company Emergency Plan Annex and Addendum Revisions |
RS-17-126, Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | 19 October 2017 | Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML18012A689 | 19 October 2017 | Revision 14 to Updated Final Safety Analysis Report, Fire Protection Report Vol. 2 Redacted |
ML17298A360 | 19 October 2017 | Revision 14 to Updated Final Safety Analysis Report, Chapter 15, Accident and Transient Analysis |
ML17298A349 | 19 October 2017 | Revision 14 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System |
ML17298A342 | 19 October 2017 | Revision 14 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML17298A337 | 19 October 2017 | Revision 14 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
RS-17-126, Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls | 19 October 2017 | Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls |
RS-17-126, Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | 19 October 2017 | Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System |
RS-17-126, Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 15, Accident and Transient Analysis | 19 October 2017 | Quad Cities Nuclear Power Station, Units 1 & 2, Revision 14 to Updated Final Safety Analysis Report, Chapter 15, Accident and Transient Analysis |
ML17138A123 | 3 May 2017 | Exelon Nuclear Radiological Emergency Plan Addendum Revisions, Including Revision 3 to EP-AA-1006, Addendum 3 and Revision 4 to EP-AA-1012, Addendum 3 |
ML16280A402 | 6 October 2016 | License Amendment Request - Supplement Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. |
ML16209A218 | 26 July 2016 | Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. |
ML16111A104 | 11 May 2016 | Issuance of Amendments to Revise the Reactor Steam Dome Pressure in Technical Specification 2.1.1, Reactor Core SLs (CAC Nos. MF6640-MF6644) |
ML16216A560 | 2 May 2016 | 2016 Quad Cities Nuclear Power Station Initial License Examination Proposed Written Examination |
ML16216A574 | 2 May 2016 | 2016 Quad Cities Nuclear Power Station Administered Written Examination |
IR 05000254/2016001 | 28 April 2016 | NRC Integrated Inspection Report 05000254/2016001; 05000265/2016001, January 1, 2016 Through March 31, 2016 |
RS-16-077, Response to Request for Additional Information Regarding Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls. | 14 April 2016 | Response to Request for Additional Information Regarding Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls. |
ML15324A439 | 17 December 2015 | Issuance of Amendments (CAC Nos. MF5471-MF5476) |
RS-15-258, County, and Quad Cities - Response to Request for Additional Information Regarding License Amendment Request Adding Technical Specification for Inservice Leak and Hydrostatic Testing Operation | 29 September 2015 | County, and Quad Cities - Response to Request for Additional Information Regarding License Amendment Request Adding Technical Specification for Inservice Leak and Hydrostatic Testing Operation |
RS-15-108, Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls. | 18 August 2015 | Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls. |
RS-14-322, License Amendment Request for Addition of New LCO 3.10.8 for Reactor Vessel Hydrostatic and Leak Testing Requirements and for Adoption of TSTF-484, Revision 0, Use Of. | 22 December 2014 | License Amendment Request for Addition of New LCO 3.10.8 for Reactor Vessel Hydrostatic and Leak Testing Requirements and for Adoption of TSTF-484, Revision 0, Use Of. |
RS-14-192, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process | 14 July 2014 | Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process |
RS-13-288, Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report. | 19 December 2013 | Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report. |
RS-12-064, Relief Request 14R-19 Associated with the Reactor Pressure Vessel Nozzle Repairs | 6 April 2012 | Relief Request 14R-19 Associated with the Reactor Pressure Vessel Nozzle Repairs |
ML113202795 | 8 March 2012 | Issuance of Amendment No. 250 and 245, Regarding Technical Specification Change for Minimum Critical Power Safety Limit |
ML113260348 | 22 November 2011 | Request for Technical Specification Change for Safety Limit Minimum Critical Power Ratio |
RS-11-180, Quad Cities, Unit 2 - Request for Technical Specification Change for Safety Limit Minimum Critical Power Ratio | 22 November 2011 | Quad Cities, Unit 2 - Request for Technical Specification Change for Safety Limit Minimum Critical Power Ratio |