Issue date | Title | |
---|---|---|
ML23212B105 | 31 July 2023 | Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise |
ML23103A334 | 13 April 2023 | Submittal of Changes to Technical Specifications Bases |
ML23005A008 | 23 February 2023 | Technical Specifications to Correct Non-conservative Technical Specification Table 3.3.2-1 for Main Steam Line Isolation Trip Function 1.G (EPID L 2020 Lla 0034) Amds. 259 and 221 |
ML23052A023 | 17 February 2023 | License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation |
ML22278A239 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems |
ML22278A272 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program, Sections 1 Thru 2 |
ML22278A283 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 15, Section 15, Accident Analyses |
ML22278A260 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9A, Fire Protection Evaluation Report |
ML22278A251 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 7, Section 7.7, Control Systems Not Required for Safety |
ML22278A242 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML22278A285 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 15, Sections 15.6 Through 15.12 |
ML22278A235 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 7, Section 7.3, Engineered Safety Feature Systems |
ML22278A232 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML22278A231 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.4 Through 7.5 |
ML22278A225 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features |
ML22278A221 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 7, Section 7.6, All Other Instrumentation Systems Required for Safety |
ML22278A220 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems |
ML22278A215 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 06, Sections 3 Thru 7 |
ML22278A212 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML22278A203 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 1, Section 1.13, TMI-2 Related Requirements for New Operating Licenses |
ML22278A202 | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 01 (003) Sections 7-12 |
ML22105A042 | 13 April 2022 | Submittal of Changes to Technical Specifications Bases |
ML22055A601 | 24 February 2022 | License Amendment Request - Proposed Changes to Technical Specification 3.3.7.4, Remote Shutdown System Instrumentation and Controls |
ML22055A600 | 24 February 2022 | License Amendment Request - Proposed Change to Correct Nonconservative Technical Specification Table 3.3.2-1 for Main Steam Line Isolation Trip Function 1.g |
ML21349B378 | 15 December 2021 | License Amendment Request Proposed Changes to Technical Specification Surveillance Requirements for Emergency Diesel Generator Frequency and Voltage Tolerances and for Emergency Core Cooling System Pump Flow |
ML21335A077 | 7 December 2021 | Dec 07 2021 LGS Digital Modernization Pre-submittal Meeting Slides |
JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 27 September 2021 | Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position |
ML21253A062 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 15, Decrease in Reactor Coolant Inventory, Sections 6 Thru 12 (Redacted) |
ML21133A045 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 6, Sections 6.3 Through 6.7 |
ML21133A048 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 6, Sections 6.0 Through 6.2 |
ML21133A051 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 1, Sections 1.7 Through 1.12 |
ML21133A054 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 1, Section 1.13, TMI-2 Related Requirements for New Operating Licenses |
ML21133A055 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems |
ML21133A059 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Table of Contents |
ML21133A070 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.1 Through 5.4 |
ML21133A080 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 1, Sections 1.1 Though 1.6 |
ML21133A082 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 7, Section 7.6., All Other Instrumentation Systems Required for Safety |
ML21133A134 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 15, Sections 15.0 Through 15.5 |
ML21133A124 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program, Sections 1 Thru 2 |
ML21133A085 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.4 Through 7.5 |
ML21133A091 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 7, Section 7.7, Control Systems Not Required for Safety |
ML21133A087 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.1 Through 7.2 |
ML21133A086 | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 7, Section 7.3, Engineered Safety Feature Systems |
ML21032A270 | 22 February 2021 | Issuance of Amendment Nos. 252 and 214, Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements |
ML20247J372 | 3 September 2020 | Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0 Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements |
ML20111A177 | 13 April 2020 | Submittal of Changes to Technical Specifications Bases |
ML20034F637 | 28 February 2020 | Issuance of Amendment Nos. 240 and 203 to Implement TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B |
ML19207A006 | 3 October 2019 | Issuance of Amendment Nos. 237 and 200 Revise Technical Specifications to Allow Penetration Flow Path Isolation for Inoperable Isolation Actuation Instrumentation |
ML19176A033 | 28 August 2019 | Issuance of Amendments to Adopt TSTF-564, Safety Limit MCPR |