Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23212B10531 July 2023Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise
ML23103A33413 April 2023Submittal of Changes to Technical Specifications Bases
ML23005A00823 February 2023Technical Specifications to Correct Non-conservative Technical Specification Table 3.3.2-1 for Main Steam Line Isolation Trip Function 1.G (EPID L 2020 Lla 0034) Amds. 259 and 221
ML23052A02317 February 2023License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation
ML22278A23919 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML22278A27219 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program, Sections 1 Thru 2
ML22278A28319 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 15, Section 15, Accident Analyses
ML22278A26019 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9A, Fire Protection Evaluation Report
ML22278A25119 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 7, Section 7.7, Control Systems Not Required for Safety
ML22278A24219 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML22278A28519 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 15, Sections 15.6 Through 15.12
ML22278A23519 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 7, Section 7.3, Engineered Safety Feature Systems
ML22278A23219 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML22278A23119 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.4 Through 7.5
ML22278A22519 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features
ML22278A22119 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 7, Section 7.6, All Other Instrumentation Systems Required for Safety
ML22278A22019 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems
ML22278A21519 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 06, Sections 3 Thru 7
ML22278A21219 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML22278A20319 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 1, Section 1.13, TMI-2 Related Requirements for New Operating Licenses
ML22278A20219 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 01 (003) Sections 7-12
ML22105A04213 April 2022Submittal of Changes to Technical Specifications Bases
ML22055A60124 February 2022License Amendment Request - Proposed Changes to Technical Specification 3.3.7.4, Remote Shutdown System Instrumentation and Controls
ML22055A60024 February 2022License Amendment Request - Proposed Change to Correct Nonconservative Technical Specification Table 3.3.2-1 for Main Steam Line Isolation Trip Function 1.g
ML21349B37815 December 2021License Amendment Request Proposed Changes to Technical Specification Surveillance Requirements for Emergency Diesel Generator Frequency and Voltage Tolerances and for Emergency Core Cooling System Pump Flow
ML21335A0777 December 2021Dec 07 2021 LGS Digital Modernization Pre-submittal Meeting Slides
JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position27 September 2021Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position
ML21253A06229 April 20210 to Updated Final Safety Analysis Report, Chapter 15, Decrease in Reactor Coolant Inventory, Sections 6 Thru 12 (Redacted)
ML21133A04529 April 20210 to Updated Final Safety Analysis Report, Chapter 6, Sections 6.3 Through 6.7
ML21133A04829 April 20210 to Updated Final Safety Analysis Report, Chapter 6, Sections 6.0 Through 6.2
ML21133A05129 April 20210 to Updated Final Safety Analysis Report, Chapter 1, Sections 1.7 Through 1.12
ML21133A05429 April 20210 to Updated Final Safety Analysis Report, Chapter 1, Section 1.13, TMI-2 Related Requirements for New Operating Licenses
ML21133A05529 April 20210 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems
ML21133A05929 April 20210 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Table of Contents
ML21133A07029 April 20210 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.1 Through 5.4
ML21133A08029 April 20210 to Updated Final Safety Analysis Report, Chapter 1, Sections 1.1 Though 1.6
ML21133A08229 April 20210 to Updated Final Safety Analysis Report, Chapter 7, Section 7.6., All Other Instrumentation Systems Required for Safety
ML21133A13429 April 20210 to Updated Final Safety Analysis Report, Chapter 15, Sections 15.0 Through 15.5
ML21133A12429 April 20210 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program, Sections 1 Thru 2
ML21133A08529 April 20210 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.4 Through 7.5
ML21133A09129 April 20210 to Updated Final Safety Analysis Report, Chapter 7, Section 7.7, Control Systems Not Required for Safety
ML21133A08729 April 20210 to Updated Final Safety Analysis Report, Chapter 7, Sections 7.1 Through 7.2
ML21133A08629 April 20210 to Updated Final Safety Analysis Report, Chapter 7, Section 7.3, Engineered Safety Feature Systems
ML21032A27022 February 2021Issuance of Amendment Nos. 252 and 214, Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements
ML20247J3723 September 2020Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0 Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements
ML20111A17713 April 2020Submittal of Changes to Technical Specifications Bases
ML20034F63728 February 2020Issuance of Amendment Nos. 240 and 203 to Implement TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B
ML19207A0063 October 2019Issuance of Amendment Nos. 237 and 200 Revise Technical Specifications to Allow Penetration Flow Path Isolation for Inoperable Isolation Actuation Instrumentation
ML19176A03328 August 2019Issuance of Amendments to Adopt TSTF-564, Safety Limit MCPR