Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
IR 05000373/2022011 | 1 November 2022 | County Station Design Basis Assurance Inspection (Teams) Inspection Report 05000373/2022011 and 05000374/2022011 |
RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration | 3 October 2022 | Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration |
ML22111A230 | 13 April 2022 | 5 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML22111A234 | 13 April 2022 | 5 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML22111A251 | 13 April 2022 | 5 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis |
ML22111A256 | 13 April 2022 | Technical Requirements Manual |
JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 27 September 2021 | Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position |
ML21005A088 | 1 December 2020 | Scenarios |
ML21004A225 | 1 December 2020 | County, Scenarios |
RS-20-115, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | 18 November 2020 | Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements |
ML20150A256 | 4 June 2020 | EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 006 Chap 06 Eng Safety Features-ML20111A253_Redacted |
ML20112J645 | 12 May 2020 | Final ASP Analysis - LaSalle 2 (LER 374-01-003) |
ML20111A252 | 13 April 2020 | 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems |
ML20111A274 | 13 April 2020 | Technical Requirements Manual |
ML20111A248 | 13 April 2020 | 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML20111A269 | 13 April 2020 | 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses |
ML19176A033 | 28 August 2019 | Issuance of Amendments to Adopt TSTF-564, Safety Limit MCPR |
RS-19-003, Application to Adopt TSTF-564, Safety Limit Mcpr. | 1 February 2019 | Application to Adopt TSTF-564, Safety Limit Mcpr. |
ML20176A222 | 11 December 2018 | Ile As-Administered Scenarios |
ML20258A049 | 11 December 2018 | Ile Proposed Operating Test |
ML18226A202 | 15 October 2018 | Issuance of Amendments to Renewed Facility Operating Licenses Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control |
ML18200A080 | 18 July 2018 | Submittal of Fourth 10-Year Interval Inservice Testing (IST) Program Plan |
RS-18-028, License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High Pressure Core Spray Diesel Generator | 19 April 2018 | License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High Pressure Core Spray Diesel Generator |
ML20038A157 | 1 April 2018 | UFSAR, Revision 23 and Fire Protection Report (Fpr), Revision 8 - Chapter 6 Eng Safety Features (Redacted) |
ML18008A123 | 6 February 2018 | Issuance of Amendments to Renewed Facility Operating Licenses Revision to Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits (CAC Nos. MG0211 and MG0212; EPID L-2017-LLA-0279) |
ML18022A105 | 22 January 2018 | NRR E-mail Capture - EPID-L-2017-LLA-0415--LaSalle Units 1 and 2, Results of Acceptance Review-Regarding License Amendment Request to Adopt TSTF-542, Rev 2 |
RS-17-170, Company Emergency Plan Annex and Addendum Revisions | 19 December 2017 | Company Emergency Plan Annex and Addendum Revisions |
RS-17-127, Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. | 13 December 2017 | Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. |
RS-17-100, Request to Revise Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits | 29 August 2017 | Request to Revise Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits |
IR 05000373/2017008 | 17 August 2017 | NRC Design Bases Assurance Inspection (Programs); Inspection Report 05000373/2017008; 05000374/2017008 (Gmh) |
ML17095A922 | 16 November 2016 | 2016 LaSalle County Station Initial License Examination Administered Scenarios |
ML17095A759 | 16 November 2016 | 2016 LaSalle County Station Initial License Examination Administered Written Examination |
ML17095A307 | 16 November 2016 | 2016 LaSalle County Station Initial License Examination Proposed Operating Test |
ML17095A300 | 16 November 2016 | 2016 LaSalle County Station Initial License Examination Proposed Written Exam |
ML16259A059 | 19 October 2016 | License Appendix a and B |
ML16280A402 | 6 October 2016 | License Amendment Request - Supplement Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. |
ML16167A463 | 6 September 2016 | UFSAR, Rev 22, Chap 06 Eng Safety Features - Redacted |
ML16155A110 | 23 August 2016 | Issuance of Amendments Reduction in the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls |
ML16209A218 | 26 July 2016 | Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. |
RS-16-076, Response to Request for Additional Information Regarding License Amendment Request to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls. | 11 April 2016 | Response to Request for Additional Information Regarding License Amendment Request to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls. |
ML16111B212 | 11 April 2016 | LaSalle County, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 22, Chapter 1.0 - Introduction and General Description of Plant |
RS-16-080, LaSalle County, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 22, Chapter 1.0 - Introduction and General Description of Plant | 11 April 2016 | LaSalle County, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 22, Chapter 1.0 - Introduction and General Description of Plant |
ML15324A439 | 17 December 2015 | Issuance of Amendments (CAC Nos. MF5471-MF5476) |
RS-15-279, Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls. | 19 November 2015 | Request for License Amendment to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls. |
RS-15-258, County, and Quad Cities - Response to Request for Additional Information Regarding License Amendment Request Adding Technical Specification for Inservice Leak and Hydrostatic Testing Operation | 29 September 2015 | County, and Quad Cities - Response to Request for Additional Information Regarding License Amendment Request Adding Technical Specification for Inservice Leak and Hydrostatic Testing Operation |
RS-14-322, License Amendment Request for Addition of New LCO 3.10.8 for Reactor Vessel Hydrostatic and Leak Testing Requirements and for Adoption of TSTF-484, Revision 0, Use Of. | 22 December 2014 | License Amendment Request for Addition of New LCO 3.10.8 for Reactor Vessel Hydrostatic and Leak Testing Requirements and for Adoption of TSTF-484, Revision 0, Use Of. |
ML14343A841 | 9 December 2014 | License Renewal Application, Title Page -Section 3, Table 3.4.2-5 |
RS-14-192, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process | 14 July 2014 | Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process |
ML14113A089 | 11 April 2014 | Updated Final Safety Analysis Report, Revision 20, Chapter 5.0, Reactor Coolant System and Connected Systems |
RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 5.0, Reactor Coolant System and Connected Systems | 11 April 2014 | LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Chapter 5.0, Reactor Coolant System and Connected Systems |