ML23241A546 | 25 May 2023 | 7 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System |
DCL-22-052, Emergency Plan Update | 6 July 2022 | Emergency Plan Update |
ML21305A099 | 11 October 2021 | 6 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System |
DCL-20-076, Technical Specification Bases | 10 September 2020 | Technical Specification Bases |
ML20268A367 | 30 June 2020 | 5 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System |
IR 05000275/2019001 | 10 May 2019 | NRC Integrated Inspection Report 05000275/2019001 and 05000323/2019001 |
DCL-18-077, Independent Spent Fuel Storage Installation - Appendix D, Revision 5.00, Emergency Action Level Technical Basis Manual | 4 October 2018 | Independent Spent Fuel Storage Installation - Appendix D, Revision 5.00, Emergency Action Level Technical Basis Manual |
ML18276A249 | 26 September 2018 | Enclosure 1 - Diablo Canyon Power Plant Emergency Plan Revision Numbers for Emergency Plan Sections and Appendices |
DCL-18-070, Technical Specification Bases, Revision 11 | 11 September 2018 | Technical Specification Bases, Revision 11 |
DCL-17-080, Emergency Plan Update for Appendix D Bases. Introduction. Category C. and Category s and Sections 10, 8, 4, and 2 | 20 September 2017 | Emergency Plan Update for Appendix D Bases. Introduction. Category C. and Category s and Sections 10, 8, 4, and 2 |
ML17179A019 | 21 June 2017 | PG&E Response to NRC Request for Additional Information Regarding License Amendment Request 16-04, Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, 'Development of Emergency Action Levels for Non-Passive .. |
ML17206A061 | 31 December 2016 | Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 5, Reactor Coolant System |
DCL-17-038, Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 5, Reactor Coolant System | 31 December 2016 | Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 5, Reactor Coolant System |
DCL-16-126, Revision 10 to Technical Specification Bases | 30 December 2016 | Revision 10 to Technical Specification Bases |
ML16145A325 | 25 April 2016 | 2016-04 - Final Operating Test |
DCL-16-015, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term. | 1 February 2016 | Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term. |
ML15204A222 | 27 August 2015 | Issuance of Amendment Nos. 219 and 221, Adopt Technical Specifications Task Force Traveler TSTF-432, Revision 1, Change in Technical Specification End States (WCAP-16294) |
DCL-15-059, Technical Specification Bases, Revision 9 | 5 May 2015 | Technical Specification Bases, Revision 9 |
DCL-14-036, Response to Request for Additional Information on License Amendment Request for Digital Process Protection System Replacement | 30 April 2014 | Response to Request for Additional Information on License Amendment Request for Digital Process Protection System Replacement |
DCL-13-092, Technical Specification Bases, Revision 8 | 16 September 2013 | Technical Specification Bases, Revision 8 |
DCL-13-043, Supplement to License Amendment Request 11-07. Process Protection System Replacement. | 30 April 2013 | Supplement to License Amendment Request 11-07. Process Protection System Replacement. |
DCL-12-050, Attachment 2 to DCL-12-050, Final Safety Analysis Report Changes for Process Protection System Replacement | 6 June 2012 | Attachment 2 to DCL-12-050, Final Safety Analysis Report Changes for Process Protection System Replacement |
DCL-11-104, Attachment 1: List of Regulatory Commitments | 26 October 2011 | Attachment 1: List of Regulatory Commitments |
ML11307A332 | 26 October 2011 | Evaluation of the Proposed Change License Amendment Request 11-07 Process Protection System Replacement |
DCL-10-026, Technical Specification 5.6.8 PAM Instrumentation Report | 23 March 2010 | Technical Specification 5.6.8 PAM Instrumentation Report |
DCL-09-020, Updated Emergency Plan Implementing Procedures | 30 March 2009 | Updated Emergency Plan Implementing Procedures |
ML11216A092 | 1 March 2009 | 0523 - R504P - Westinghouse Advanced Technology - 04.9 Shutdown Plant Problems |
DCL-08-097, Submittal of Revision 4 to Emergency Plan Update | 19 November 2008 | Submittal of Revision 4 to Emergency Plan Update |
NOC-AE-07002231, Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46) | 7 November 2007 | Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46) |
DCL-07-097, License Amendment Request 07-04, Proposed Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk Informed Technical Specifications Initiative 5b) | 15 October 2007 | License Amendment Request 07-04, Proposed Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk Informed Technical Specifications Initiative 5b) |
IR 05000275/2006003 | 14 August 2006 | IR 05000275-06-003, 05000323-06-003; 4/1/06 - 6/30/06; Diablo Canyon Power Plant Units 1 and 2; Inservice Inspection Activities, Operability Evaluations, Refueling and Outage Activities, and Access Control to Radiologically Significant Area |
ML041320206 | 4 May 2004 | Tech Specs, Issuance of Amendments Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors |
DCL-04-033, Emergency Plan, Revision 4, Section 5, Change 5: Sections 4 and 7, Change 4: Section 6, Change 3: Sections 1. 2 and 8, Change 2: and Appendix A. Change 1 | 29 March 2004 | Emergency Plan, Revision 4, Section 5, Change 5: Sections 4 and 7, Change 4: Section 6, Change 3: Sections 1. 2 and 8, Change 2: and Appendix A. Change 1 |
ML040780380 | 11 March 2004 | Supplement to License Amendment Request 03-19 Revision to Technical Specifications 3.3.3 Post Accident Monitoring (PAM) Instrumentation and 3.6.8 Hydrogen Recombiners |
DCL-03-173, License Amendment Request 03-19 for Revision to Technical Specifications 3.3.3, Post-Accident Monitoring (PAM) Instrumentation and 3.6.8, Hydrogen Recombiners | 30 December 2003 | License Amendment Request 03-19 for Revision to Technical Specifications 3.3.3, Post-Accident Monitoring (PAM) Instrumentation and 3.6.8, Hydrogen Recombiners |
DCL-03-073, Emergency Plan Implementing Procedure Update | 19 June 2003 | Emergency Plan Implementing Procedure Update |
ML032130106 | 27 January 2003 | Brief for the Federal Respondents, Dated 01/27/2003 |
ML030300680 | 27 January 2003 | Brief for Federal Respondents, Dated January 27, 2003 |
Information Notice 1999-14, Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick | 5 May 1999 | Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick |
ML20205B230 | 25 March 1999 | Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990125-28 |
NRC Generic Letter 1998-02 | 28 May 1998 | NRC Generic Letter 1998-002: Loss of Reactor Coolant Inventory and Associated Potential for Loss of Emergency Mitigation Functions While in a Shutdown Condition |
Information Notice 1997-83, Recent Events Involving Reactor Coolant System Inventory Control During Shutdown | 5 December 1997 | Recent Events Involving Reactor Coolant System Inventory Control During Shutdown |
Information Notice 1996-65, Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown | 11 December 1996 | Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown |
Information Notice 1996-56, Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power | 22 October 1996 | Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power |
Information Notice 1996-42, Unexpected Opening of Multiple Safety Relief Valves | 5 August 1996 | Unexpected Opening of Multiple Safety Relief Valves |
Information Notice 1996-37, Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown | 18 June 1996 | Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown |
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel | 18 January 1996 | Partial Bypass of Shutdown Cooling Flow from Reactor Vessel |
Information Notice 1994-52, Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 | 15 July 1994 | Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 |
Information Notice 1994-36, Undetected Accumulation of Gas in Reactor Coolant System | 24 May 1994 | Undetected Accumulation of Gas in Reactor Coolant System |
Information Notice 1993-89, Potential Problems with BWR Level Instrumentation Backfill Modifications | 26 November 1993 | Potential Problems with BWR Level Instrumentation Backfill Modifications |