Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23241A54625 May 20237 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System
DCL-22-052, Emergency Plan Update6 July 2022Emergency Plan Update
ML21305A09911 October 20216 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System
DCL-20-076, Technical Specification Bases10 September 2020Technical Specification Bases
ML20268A36730 June 20205 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System
IR 05000275/201900110 May 2019NRC Integrated Inspection Report 05000275/2019001 and 05000323/2019001
DCL-18-077, Independent Spent Fuel Storage Installation - Appendix D, Revision 5.00, Emergency Action Level Technical Basis Manual4 October 2018Independent Spent Fuel Storage Installation - Appendix D, Revision 5.00, Emergency Action Level Technical Basis Manual
ML18276A24926 September 2018Enclosure 1 - Diablo Canyon Power Plant Emergency Plan Revision Numbers for Emergency Plan Sections and Appendices
DCL-18-070, Technical Specification Bases, Revision 1111 September 2018Technical Specification Bases, Revision 11
DCL-17-080, Emergency Plan Update for Appendix D Bases. Introduction. Category C. and Category s and Sections 10, 8, 4, and 220 September 2017Emergency Plan Update for Appendix D Bases. Introduction. Category C. and Category s and Sections 10, 8, 4, and 2
ML17179A01921 June 2017PG&E Response to NRC Request for Additional Information Regarding License Amendment Request 16-04, Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, 'Development of Emergency Action Levels for Non-Passive ..
ML17206A06131 December 2016Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 5, Reactor Coolant System
DCL-17-038, Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 5, Reactor Coolant System31 December 2016Diablo Canyon Power Plant, Units 1 & 2, Revised Updated Final Safety Analysis Report, Rev. 23, Chapter 5, Reactor Coolant System
DCL-16-126, Revision 10 to Technical Specification Bases30 December 2016Revision 10 to Technical Specification Bases
ML16145A32525 April 20162016-04 - Final Operating Test
DCL-16-015, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term.1 February 2016Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term.
ML15204A22227 August 2015Issuance of Amendment Nos. 219 and 221, Adopt Technical Specifications Task Force Traveler TSTF-432, Revision 1, Change in Technical Specification End States (WCAP-16294)
DCL-15-059, Technical Specification Bases, Revision 95 May 2015Technical Specification Bases, Revision 9
DCL-14-036, Response to Request for Additional Information on License Amendment Request for Digital Process Protection System Replacement30 April 2014Response to Request for Additional Information on License Amendment Request for Digital Process Protection System Replacement
DCL-13-092, Technical Specification Bases, Revision 816 September 2013Technical Specification Bases, Revision 8
DCL-13-043, Supplement to License Amendment Request 11-07. Process Protection System Replacement.30 April 2013Supplement to License Amendment Request 11-07. Process Protection System Replacement.
DCL-12-050, Attachment 2 to DCL-12-050, Final Safety Analysis Report Changes for Process Protection System Replacement6 June 2012Attachment 2 to DCL-12-050, Final Safety Analysis Report Changes for Process Protection System Replacement
DCL-11-104, Attachment 1: List of Regulatory Commitments26 October 2011Attachment 1: List of Regulatory Commitments
ML11307A33226 October 2011Evaluation of the Proposed Change License Amendment Request 11-07 Process Protection System Replacement
DCL-10-026, Technical Specification 5.6.8 PAM Instrumentation Report23 March 2010Technical Specification 5.6.8 PAM Instrumentation Report
DCL-09-020, Updated Emergency Plan Implementing Procedures30 March 2009Updated Emergency Plan Implementing Procedures
ML11216A0921 March 20090523 - R504P - Westinghouse Advanced Technology - 04.9 Shutdown Plant Problems
DCL-08-097, Submittal of Revision 4 to Emergency Plan Update19 November 2008Submittal of Revision 4 to Emergency Plan Update
NOC-AE-07002231, Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46)7 November 2007Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46)
DCL-07-097, License Amendment Request 07-04, Proposed Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk Informed Technical Specifications Initiative 5b)15 October 2007License Amendment Request 07-04, Proposed Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk Informed Technical Specifications Initiative 5b)
IR 05000275/200600314 August 2006IR 05000275-06-003, 05000323-06-003; 4/1/06 - 6/30/06; Diablo Canyon Power Plant Units 1 and 2; Inservice Inspection Activities, Operability Evaluations, Refueling and Outage Activities, and Access Control to Radiologically Significant Area
ML0413202064 May 2004Tech Specs, Issuance of Amendments Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors
DCL-04-033, Emergency Plan, Revision 4, Section 5, Change 5: Sections 4 and 7, Change 4: Section 6, Change 3: Sections 1. 2 and 8, Change 2: and Appendix A. Change 129 March 2004Emergency Plan, Revision 4, Section 5, Change 5: Sections 4 and 7, Change 4: Section 6, Change 3: Sections 1. 2 and 8, Change 2: and Appendix A. Change 1
ML04078038011 March 2004Supplement to License Amendment Request 03-19 Revision to Technical Specifications 3.3.3 Post Accident Monitoring (PAM) Instrumentation and 3.6.8 Hydrogen Recombiners
DCL-03-173, License Amendment Request 03-19 for Revision to Technical Specifications 3.3.3, Post-Accident Monitoring (PAM) Instrumentation and 3.6.8, Hydrogen Recombiners30 December 2003License Amendment Request 03-19 for Revision to Technical Specifications 3.3.3, Post-Accident Monitoring (PAM) Instrumentation and 3.6.8, Hydrogen Recombiners
DCL-03-073, Emergency Plan Implementing Procedure Update19 June 2003Emergency Plan Implementing Procedure Update
ML03213010627 January 2003Brief for the Federal Respondents, Dated 01/27/2003
ML03030068027 January 2003Brief for Federal Respondents, Dated January 27, 2003
Information Notice 1999-14, Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick5 May 1999Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick
ML20205B23025 March 1999Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990125-28
NRC Generic Letter 1998-0228 May 1998NRC Generic Letter 1998-002: Loss of Reactor Coolant Inventory and Associated Potential for Loss of Emergency Mitigation Functions While in a Shutdown Condition
Information Notice 1997-83, Recent Events Involving Reactor Coolant System Inventory Control During Shutdown5 December 1997Recent Events Involving Reactor Coolant System Inventory Control During Shutdown
Information Notice 1996-65, Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown11 December 1996Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown
Information Notice 1996-56, Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power22 October 1996Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power
Information Notice 1996-42, Unexpected Opening of Multiple Safety Relief Valves5 August 1996Unexpected Opening of Multiple Safety Relief Valves
Information Notice 1996-37, Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown18 June 1996Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel18 January 1996Partial Bypass of Shutdown Cooling Flow from Reactor Vessel
Information Notice 1994-52, Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 115 July 1994Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1
Information Notice 1994-36, Undetected Accumulation of Gas in Reactor Coolant System24 May 1994Undetected Accumulation of Gas in Reactor Coolant System
Information Notice 1993-89, Potential Problems with BWR Level Instrumentation Backfill Modifications26 November 1993Potential Problems with BWR Level Instrumentation Backfill Modifications